Baseline (tppss0120s000)

Use this session to maintain a baseline (planning) for a project. A baseline stores the start and end dates of each activity of the activity-structure. These start and end dates can be either manually entered in the Activities (tppss2100m000)session, as a result of network planning, or are created from a particular schedule in the external scheduling package.

Field Information

Project

The code that uniquely identifies the project.

Description

The description or name of the code.

Status

project status

Baseline

baseline (planning)

Details
Description

The description or name of the code.

Baseline Status

The status of the current baseline.

Allowed values

Free

The baseline is created.

Approved

The baseline is approved.

Note: The baseline data cannot be updated after the baseline status is Approved.
Approval Date

The date and time of approval of the baseline.

Baseline Start Date

The earliest possible start date and time of the baseline. This value is displayed based on the Activity Baseline (tppss2120m000) session.

Baseline Finish Date

The latest possible finish date and time of the baseline. This value is displayed based on the Activity Baseline (tppss2120m000) session.

Derived from Baseline

The baseline from which the current baseline is derived.

Tracking
Creation Date

The date and time of creation of the baseline.

Date of Last Update

The date and time the baseline was last updated.

Last Modified by

The name of the user who last modifies the baseline.

Text

If this check box is selected, a text is present.