Print Project Control (tpppc4420m000)
Use this session to print job control, purchase control, and order-control reports. Reports can be based on project, project/element, project/activity, and project/extension.
The levels at which cost control is generated are selected in the Project - Cost Control Levels (tppdm6102m000) session.
Field Information
- Report Type
 - 
            
The type of report you want to print.
Allowed values
- Project Control
 - Purchase Control
 - Order Control
 
 - Level to be Printed
 - 
            
The level on which the data is printed. The levels at which cost control is generated are selected in the Project - Cost Control Levels (tppdm6102m000) session.
 - Period to
 - 
            
The year up to which the level is to be printed.
 - /
 - 
            
The period to which the level is to be printed.
 - Currency
 - 
            
currency
 - Sort By
 - 
            
Indicates how you want to sort the level.
 - Sort Project by
 - 
            
Indicates how you want the project to be sorted.
 - WBS
 - 
            
If this check box is selected, the work breakdown structure elements are printed.
 - Control Accounts
 - 
            
If this check box is selected, the control accounts are used in the print.
 - Planning Packages
 - 
            
If this check box is selected, the planning packages are used in the print.
 - Work Packages
 - 
            
If this check box is selected, the work packages are used in the print.
 - Material
 - 
            
If this check box is selected, this cost control cost type is printed.
 - Labor
 - 
            
If this check box is selected, this cost control cost type is printed.
 - Equipment
 - 
            
If this check box is selected, this cost control cost type is printed.
 - Subcontracting
 - 
            
If this check box is selected, this cost control cost type is printed.
 - Sundry Cost
 - 
            
If this check box is selected, this cost control cost type is printed.
 - Break-Down Lines
 - 
            
If this check box is selected, the project breakdown-lines are printed.