Calculate Interim Result Defaults (tpppc4205m000)

Use this session to to calculate the Percentage Completed or the Earned Revenue Factor for a range of projects.

Field Information

Selection Range
Calculate for

The option based on which the revenue recognition is calculated.

Allowed values

  • Contract
  • Project
Contract

The From and To fields define a range of: contracts

Note: This field is enabled only if Contract is selected in the Calculate for field.
Contract Line

The From and To fields define a range of: contract lines

Note: This field is enabled only if Contract is selected in the Calculate for field.
Project

The From and To fields define a range of: projects.

Note: This field is enabled only if Project is selected in the Calculate for field.
Fiscal Period Selection
Fiscal Period Selection

The fiscal period for which the actual cost and the cost forecast are calculated.

Allowed values

Previous Period

The fiscal period prior to the current fiscal period is considered. This is the default value.

Current Period

The current fiscal period based on the current date is considered.

Period for Date

The fiscal period based on the date you specify for the period. By default, the current date is considered.

Manual

The fiscal period and year based on period and year you specify.

Calculate Defaults up to and including
Calculate up to and including fiscal period

The fiscal period up to and including which the actual cost and the cost forecast are calculated.

Note: The value is defaulted based on the value set in the Fiscal Period Selection field. You cannot modify the value.
Year

The fiscal year of the period up to and including which the actual cost and the cost forecast are calculated.

Note: The value is defaulted based on the value set in the Fiscal Period Selection field. You cannot modify the value.
Period End Date

The date of the fiscal period up to and including which the actual cost and the cost forecast are calculated.

Note: The value is defaulted based on the value set in the Fiscal Period Selection field. You cannot modify the value.
Revenue Interim Results
Percentage of Completion

If this check box is selected, LN calculates the percentage completed.

Earned Revenue Factor

If this check box is selected, LN calculates the earned revenue factor.

Cost Interim Results
Profit Percentage

If this check box is selected, you can specify the base to calculate the profit percentage.

Scenario
Primary Interim Results

If this check box is selected, the default values to determine the interim result for the primary scenario is calculated.

Note: By default, this check box is selected.
Alternate Interim Results

If this check box is selected, the default values to determine the interim result for the alternate scenario is calculated.

Update Mode
Simulate

Select the update mode.

Allowed values

Simulate

This option provides a preview of the data before deleting the sampling rules.

Update

This option updates the records when the sampling rules are deleted.