Project Assignments (tppdm2110m000)

Use this session to assign the projects to the overhead application base. It is mandatory for the calculation of overhead costs.

Field Information

Base

The code that uniquely identifies the overhead application base.

Version

The Version number of the corresponding base-code for the overhead application.

Exclude

If this check box is selected, the enterprise unit, program, project-group or project, within the specified range are excluded from overhead calculation and application.

Project Level

The aggregation level of the enterprise unit, program, project-group or project, at which the overheads are applied and calculated.

Allowed values

Enterprise Unit

The overheads are calculated at enterprise unit unit level.

Program

The overheads are calculated at program level.

Project Group

The overheads are calculated for project groups.

Project

The overheads are calculated at project level.

From

The From and To fields define a range of: Enterprise units, Programs, Project-groups or Projects specified in the Project Level field.