Estimate Lines Selection (tpest2800m000)
Use this session to specify a selection for utilities used in the Estimate Lines (tpest2100m000) session, or to select estimate lines that are launched to budget. You can choose to select a complete structure, or a selection of nodes. If you select the Discrete Lines check box, the discrete lines are added.
Field Information
- Structure ID
 - 
            
The code of the structure ID of the estimate.
 - Description
 - 
            
The description or name of the code.
 - Complete Structure
 - 
            
If this check box is selected, LN allows you to select the complete structure.
 - Replace Structural Element
 - 
            
If this check box is selected, you can select a structural element and the child elements linked to it.
 - Replace Structural Element
 - 
            
The structural element code. The estimate lines linked to this structural element and its child elements are selected. This field is enabled only when you select the Node (Sub-Structure) check box.
 - Description
 - 
            
The From and To fields define a range of:
 - Structural Element
 - 
            
The From and To fields define a range of: structural element.
 - Structural Element
 - 
            
The From and To fields define a range of: structural element.
 - Discrete Lines
 - 
            
If this check box is selected, discrete lines are also selected.
If this check box is cleared, discrete lines are not selected.
 - Sequence Number
 - 
            
The From and To fields define a range of: estimate line numbers.
 - Sequence Number
 - 
            
The From and To fields define a range of: estimate line numbers.
 - Estimating Type
 - 
            
The From and To fields define a range of: estimate type.
 - Estimating Type
 - 
            
The From and To fields define a range of: estimate type.
 - Estimate Level
 - 
            
The From and To fields define a range of: estimate level at which the cost is estimated.
 - Estimate Level
 - 
            
The From and To fields define a range of: estimate level at which the cost is estimated.
 - Cost Component
 - 
            
The From and To fields define a range of: cost component.
Note: This field is visible only when the Cost Component check box is selected in the Project Parameters (tppdm0100s000) session, else disabled. - Cost Component
 - 
            
The From and To fields define a range of: cost component.
 - Extension
 - 
            
The From and To fields define a range of: extension
Note: This field is visible only when the Extension check box is selected in the Project Parameters (tppdm0100s000) session, else disabled. - Extension
 - 
            
The From and To fields define a range of: extension
 - User-Defined Status
 - 
            
The From and To fields define a range of: user defined status.
 - User-Defined Status
 - 
            
The From and To fields define a range of: user defined status.
 - Selection of Cost Types
 - 
            
- Material Lines
 - 
                     
If this check box is selected, LN includes the lines of the cost type material cost, if applicable for the estimate lines.
 - Labor Lines
 - 
                     
If this check box is selected, LN includes the labor cost types used for the estimate lines.
 - Equipment Lines
 - 
                     
If this check box is selected, LN includes the equipment cost types used for the estimate lines.
 - Subcontracting Lines
 - 
                     
If this check box is selected, LN includes the subcontracting cost types used for the estimate lines.
 - Sundry Costs Lines
 - 
                     
If this check box is selected, LN includes the sundry cost types used for the estimate lines.
 - Reference Activity Lines
 - 
                     
If this check box is selected, LN includes the reference activity lines used for the estimate lines.
 - Empty Cost Type Lines
 - 
                     
If this check box is selected, LN includes the empty cost types used for the estimate lines.