Estimate Lines Selection (tpest2800m000)

Use this session to specify a selection for utilities used in the Estimate Lines (tpest2100m000) session, or to select estimate lines that are launched to budget. You can choose to select a complete structure, or a selection of nodes. If you select the Discrete Lines check box, the discrete lines are added.

Note: You can select the cost types only when the session is started from the Details option in the Copy Estimate Lines (tpest1205m000) or Copy Budget to Estimates (tpest1205m100) session.

Field Information

Structure ID

The code of the structure ID of the estimate.

Description

The description or name of the code.

Complete Structure

If this check box is selected, LN allows you to select the complete structure.

Replace Structural Element

If this check box is selected, you can select a structural element and the child elements linked to it.

Replace Structural Element

The structural element code. The estimate lines linked to this structural element and its child elements are selected. This field is enabled only when you select the Node (Sub-Structure) check box.

Description

The From and To fields define a range of:

Structural Element

The From and To fields define a range of: structural element.

Structural Element

The From and To fields define a range of: structural element.

Discrete Lines

If this check box is selected, discrete lines are also selected.

If this check box is cleared, discrete lines are not selected.

Sequence Number

The From and To fields define a range of: estimate line numbers.

Sequence Number

The From and To fields define a range of: estimate line numbers.

Estimating Type

The From and To fields define a range of: estimate type.

Estimating Type

The From and To fields define a range of: estimate type.

Estimate Level

The From and To fields define a range of: estimate level at which the cost is estimated.

Estimate Level

The From and To fields define a range of: estimate level at which the cost is estimated.

Cost Component

The From and To fields define a range of: cost component.

Note: This field is visible only when the Cost Component check box is selected in the Project Parameters (tppdm0100s000) session, else disabled.
Cost Component

The From and To fields define a range of: cost component.

Extension

The From and To fields define a range of: extension

Note: This field is visible only when the Extension check box is selected in the Project Parameters (tppdm0100s000) session, else disabled.
Extension

The From and To fields define a range of: extension

User-Defined Status

The From and To fields define a range of: user defined status.

User-Defined Status

The From and To fields define a range of: user defined status.

Selection of Cost Types
Material Lines

If this check box is selected, LN includes the lines of the cost type material cost, if applicable for the estimate lines.

Labor Lines

If this check box is selected, LN includes the labor cost types used for the estimate lines.

Equipment Lines

If this check box is selected, LN includes the equipment cost types used for the estimate lines.

Subcontracting Lines

If this check box is selected, LN includes the subcontracting cost types used for the estimate lines.

Sundry Costs Lines

If this check box is selected, LN includes the sundry cost types used for the estimate lines.

Reference Activity Lines

If this check box is selected, LN includes the reference activity lines used for the estimate lines.

Empty Cost Type Lines

If this check box is selected, LN includes the empty cost types used for the estimate lines.