Subcontracting Model (tisub1600m000)
Use this session to view and manage models for subcontracting of products or intermediate products.
Data from the following sessions is displayed:
- Product Subcontractor Bill of Material (tisub1110m000)
 - Business Partners per Item (tdipu0110m300)
 
Field Information
- Production Site
 - 
            
The ID of the site where subcontracted production takes place.
 - Product
 - 
            
The subcontracted item.
 - Revision
 - 
            
The revision ID.
 - 
            
- Subcontractor
 - 
                     
subcontractor
 - Subcontractor Site
 - 
                     
The location where the subcontracted manufacturing takes place.
 - Subcontractor Cluster
 - 
                     
The planning cluster the subcontractor belongs to.
 - Subcontractor Warehouse
 - 
                     
The external warehouse to which materials are delivered.
 - Ship-from Business Partner
 - 
                     
The business partner who ships the (intermediate) product.
 
 - 
            
- Effective Date
 - 
                     
The date and time on which the subcontracting takes effect.
 - Expiry Date
 - 
                     
expiry date
 - BOM Quantity
 - 
                     
BOM quantity
 - Available for Planning
 - 
                     
If this check box is selected, the subcontracting model is available to be used for planning.
 - Used for Planning
 - 
                     
If this check box is selected, the subcontracting model is enabled for use in planning. The routing of the subcontracting model can be used for multiple subcontracting items.
 - Use for Costing
 - 
                     
If this check box is selected, the subcontracting model is enabled for costing, and for use in the calculation of the standard cost of a subcontracting item.
 
 - 
            
- Source
 - 
                     
The source of the subcontracting model.
Allowed values
- Manual
 - 
               
The P-BOM is defined in the Production Bills of Material (timfc3100m000) session.
 - Production Bill of Material
 - 
               
The P-BOM revision was generated from an existing production bill of material.
 - Engineering Bill of Material
 - 
               
The P-BOM is generated from an engineering bill of material.
Note: If the P-BOM is generated from an E-BOM, the Source Engineering Item and Source Revision fields are filled. - Configurator (PCF)
 - 
               
The P-BOM is generated from data imported from the PCF configurator.
 - Configurator
 - 
               
The P-BOM is generated from data imported from Infor Configurator.
 - PLM
 - 
               
The P-BOM is generated from data imported from PLM.
 - Job Shop Bill of Material
 - 
               
The P-BOM was generated from a job shop bill of material.
 - Not Specified
 
 
 - 
            
- Created On
 - 
                     
The date the selected subcontracting model was created.
 - Created By
 - 
                     
The employee who created the selected subcontracting model.
 - Approved On
 - 
                     
The date the selected subcontracting model was approved for use.
 - Approved By
 - 
                     
The employee who approved the selected subcontracting model for use.
 - Expired On
 - 
                     
The date the selected subcontracting model was expired and could no longer be used.
 - Expired By
 - 
                     
The employee who expired the selected subcontracting model.
 - 
                     
- Lead Time
 - 
                              
The production time of an item expressed in hours or days, based on the supply time defined in the Item - Purchase session.
 - Transport To
 - 
                              
The time needed, in hours, to transport the subcontracted item to the subcontractor site.
 - Transport From
 - 
                              
The time needed, in hours, to transport the item to the subcontractor site.
 
 - 
                     
- Lead Time Type
 - 
                              
Specify the type of lead time used for the subcontracting model.
Allowed values
- Fixed
 - Proportional
 
 - Fixed Supply Time
 - 
                              
If the lead time type is Fixed, the supply time does not depend on the ordered quantity.
 - Supply Time
 - 
                              
If the lead time type is Proportional, the supply time needed per unit. The supply time will increase with the number of units.
 
 - 
                     
- Actual Calendar
 - 
                              
The actual calendar used by the subcontracting model.
 - Origin
 - 
                                       
The ID of the session where the actual calendar is defined.
 
 - 
                     
- Item Capacity
 - 
                              
The capacity of the subcontractor location in terms of products to deliver. This value is used in planning to analyze the availability of the subcontractor.
 - Week
 - 
                              
The period over which the item capacity is displayed.
 - Subcontracting Purchase Price
 - 
                              
The purchase price of a subcontracted item, expressed in the purchase currency.
 - /
 - 
                              
The currency in which the purchase price is expressed.
 - Unit
 - 
                              
measurement unit