Subcontracting Models (tisub1100m000)

Use this session to manage models for subcontracting products or intermediate products.

Field Information

Product

The subcontracted item.

Subcontractor

subcontractor

Subcontractor Site

The ID of the location where the subcontracted production takes place.

Ship-from Business Partner

The business partner who ships the (intermediate) product.

Revision

The revision ID.

Production Site

The site ID.

Effective Date

The date and time the subcontracting model is valid.

Expiry Date

The date and time the subcontracting model is no longer valid.

Status

The status of the subcontracting model.

Allowed values

New
Approved
Expired
Capacity / Week

The weekly capacity of the subcontracting location. This value is used in planning to analyze the availability of the subcontractor.

Available for Planning

If this check box is selected, the subcontracted model is available to be used in planning.

Use for Planning

If this check box is selected, the subcontracting model is used for planning.

Use for Costing

If this check box is selected, the subcontracting model is enabled for costing, and for use in the calculation of the standard cost of a subcontracting item.

Subcontractor Warehouse

The warehouse where the component is stored and where the allocation for a production order is made.

Note: If the component is a phantom, and you select the Inherit Warehouse if Parent Item is a Phantom check box, LN allocates the requirement for the component in the warehouse of the component's parent item.
Subcontracting Cluster

The planning cluster to which the subcontractor belongs.

BOM Quantity

BOM quantity

Source

The source of the subcontracting model.

Allowed values

Manual

The P-BOM is defined in the Production Bills of Material (timfc3100m000) session.

Production Bill of Material

The P-BOM revision was generated from an existing production bill of material.

Engineering Bill of Material

The P-BOM is generated from an engineering bill of material.

Note: If the P-BOM is generated from an E-BOM, the Source Engineering Item and Source Revision fields are filled.
Configurator (PCF)

The P-BOM is generated from data imported from the PCF configurator.

Configurator

The P-BOM is generated from data imported from Infor Configurator.

PLM

The P-BOM is generated from data imported from PLM.

Job Shop Bill of Material

The P-BOM was generated from a job shop bill of material.

Not Specified
Source Revision
Lead Time Type

Specify the type of lead time used for the subcontracting model.

Allowed values

  • Fixed
  • Proportional
Fixed Supply Time

If the lead time type is Fixed, the supply time does not depend on the ordered quantity.

Supply Time

If the lead time type is Proportional, the supply time needed per unit. The supply time will increase with the number of units.

Actual Calendar

The actual calendar used by the subcontracting model.

Origin
Created On

The date the selected subcontracting model was created.

Created By

The employee who created the selected subcontracting model.

Approved On

The date the selected subcontracting model was approved for use.

Approved By

The employee who approved the selected subcontracting model for use.

Expired On

The date the selected subcontracting model was expired and could no longer be used.

Expired By

The employee who expired the selected subcontracting model.