Subcontractor 360 (tisub0330m000)
The subcontract locations are shown per production site.
Field Information
- Planning Cluster
 - 
            
The planning cluster for which you want to display the subcontractor locations or production sites.
 - Production Site
 - 
            
The ID of the site where the subcontracting work is performed.
Note:This filter is optional.
If no production site is selected, the default production site specified in the production user profile is used.
 - Model
 - 
            
- Location
 - 
                     
If this check box is selected, subcontractor locations are present.
Click on the link to open the Subcontractor Location (tisub0625m000) session.
 - Operation Subcontracting
 - 
                     
If this check box is selected, operation subcontracting is active for the selected planning cluster and production site.
Click on the link to open the Operation Subcontractors List (tisub2100m000) session.
 
 - Product Subcontracting
 - 
            
If this check box is selected, product subcontracting is active for the selected planning cluster and production site.
Click on the link to open the Product Subcontractors List (tisub1100m000) session.
 - Planning
 - 
            
- Resource Capacity
 - 
                     
If this check box is selected, resource capacity is present at the selected subcontractor site.
Click on the link to open the Resource Capacities (cprpd2602m000) session.
 
 - Orders
 - 
            
- Subcontracted Operations
 - 
                     
If this check box is selected, subcontracted operations are present for the selected subcontractor site.
Click on the link to open the Subcontracted Operations (tisfc2110m000) session.
 - Purchase Orders
 - 
                     
If this check box is selected, the purchase orders for the subcontractor and site are displayed.
Click on the link to open the Purchase Order Intake Workbench (tdpur4601m200) session.
 
 - Subcontractor
 - 
            
The subcontractor ID.
 - Subcontractor Cluster
 - 
            
The planning cluster to which the subcontractor site belongs.
 - Subcontractor Site
 - 
            
The ID of the site that belongs to the subcontractor.
 - Production Site
 - 
            
The ID of the site for which subcontracting is done.
 - Transportation Time Method
 - 
            
The method by which the transportation time is defined is:
Allowed values
- Derived
 - Manual
 - Not Applicable
 
 - Ship-to Carrier
 - 
            
The carrier responsible for the transport of the intermediate product or materials to the subcontractor.
 - Transportation Time To
 - 
            
The time needed to transport the intermediate product or materials to the subcontractor site.
 - Time Unit To
 - 
            
The time unit in which the transportation time is expressed is:
Allowed values
- Hours
 - Days
 
 - Ship-from Carrier
 - 
            
The carrier responsible for the transport of the subcontracted item from the subcontractor.
 - Transportation Time From
 - 
            
The time needed to transport the (intermediate) product to the subcontractor site.
 - Time Unit From
 - 
            
The time unit in which the transportation time is expressed is:
Allowed values
- Hours
 - Days