Schedule Line Materials (tirpt4121m000)

Use this session to manage materials for a schedule line.

Field Information

Production Schedule

The ID of the scheduled production line.

End Item

The repetitive item that is being reported on.

Work Cell

work cell

Schedule Position

The line's position in the schedule.

Status

Production line status.

Allowed values

Free

Run schedule is controlled by the planning engine.

Released

Run schedule complete, changes can only be made manually.

Active

Production run schedule is being implemented.

Production Completed

All schedule lines for the production run were completed, but the run has not been closed.

Completed

All schedule lines for the production run were completed, and all completed products were delivered into inventory. You can still account hours and issue materials for the run schedule.

Closed

The run schedule was completed, changes can no longer be made.

Material Position

The position number of the material line.

Item

The component item that is part of the manufactured item (the standard material) used in the specified shift.

Point of Usage

The shop floor warehouse linked to the work station that contains the material for the production of the repetitive item.

Main Warehouse

The warehouse where the products are received.

Note: The receiving warehouse is defined in the production model.
Supply System

The supply system used.

Supply Warehouse

supply warehouse

Net Quantity

The net quantity of the material needed for the production schedule line.

Scrap Percentage

scrap

Estimated Quantity

The estimated quantity of material required. This value is based on the Net Quantity specified for the particular production schedule line.

Backflush

If this check box is selected, the schedule line materials are backflushed.

To Issue

The material quantity that must be issued. It is defined with the following formula:

Estimated - Backflushed
Actual Quantity

The actual quantity issued from inventory.

As-Built

If this check box is selected, the serial number or lot must be entered in the As-Built (timfc0610m000) session before the as-built is validated.