Schedule Line Materials (tirpt4121m000)
Use this session to manage materials for a schedule line.
Field Information
- Production Schedule
 - 
            
The ID of the scheduled production line.
 - End Item
 - 
            
The repetitive item that is being reported on.
 - Work Cell
 - Schedule Position
 - 
            
The line's position in the schedule.
 - Status
 - 
            
Production line status.
Allowed values
- Free
 - 
               
Run schedule is controlled by the planning engine.
 - Released
 - 
               
Run schedule complete, changes can only be made manually.
 - Active
 - 
               
Production run schedule is being implemented.
 - Production Completed
 - 
               
All schedule lines for the production run were completed, but the run has not been closed.
 - Completed
 - 
               
All schedule lines for the production run were completed, and all completed products were delivered into inventory. You can still account hours and issue materials for the run schedule.
 - Closed
 - 
               
The run schedule was completed, changes can no longer be made.
 
 - Material Position
 - 
            
The position number of the material line.
 - Item
 - 
            
The component item that is part of the manufactured item (the standard material) used in the specified shift.
 - Point of Usage
 - 
            
The shop floor warehouse linked to the work station that contains the material for the production of the repetitive item.
 - Main Warehouse
 - 
            
The warehouse where the products are received.
Note: The receiving warehouse is defined in the production model. - Supply System
 - 
            
The supply system used.
 - Supply Warehouse
 - 
            
supply warehouse
 - Net Quantity
 - 
            
The net quantity of the material needed for the production schedule line.
 - Scrap Percentage
 - Estimated Quantity
 - 
            
The estimated quantity of material required. This value is based on the Net Quantity specified for the particular production schedule line.
 - Backflush
 - 
            
If this check box is selected, the schedule line materials are backflushed.
 - To Issue
 - 
            
The material quantity that must be issued. It is defined with the following formula:
Estimated - Backflushed - Actual Quantity
 - 
            
The actual quantity issued from inventory.
 - As-Built
 - 
            
If this check box is selected, the serial number or lot must be entered in the As-Built (timfc0610m000) session before the as-built is validated.