Production Model (tirpt2100m100)

Use this session to view and maintain production model data.

This session displays data from:

  • Production Process (tirpt2110m000)
  • Materials (tirpt2120m000)
  • Products (tirpt2130m000)
  • Tools (tirpt2140m000)

Field Information

Site

The site ID.

Note: Only visible if multisite functionality is active.

Product/Tool

The repetitive item, or tool in case of multi-product, that defines the production model.

Work Cell

work cell

Production Model

production model

Revision

The ID of the product model revision.

Type

Specify the type production model.

Allowed values

Single-Product

Used to maintain production models for the manufacture of a single end item.

Multi-Product

Used to maintain production models for the manufacture of multiple end items in different quantities.

Control
Validity
Status

The status of the production model that is printed.

Allowed values

  • New
  • Approved
  • Expired
Effective Date

effective date

Expiry Date

expiry date

Usage
Use for Planning

If this check box is selected, the production model is enabled for planning.

Note: Only one production model per repetitive item can be used for costing.

Use for Costing

If this check box is selected, the production model is enabled for costing.

Note: Only one production model per repetitive item can be used for costing.

Options
Report on Work Stations
Planning
Order Plan Quantity

The planned quantity of product.

Order Plan Lead Time

The planned order lead time.

Receiving Warehouse

The ID of the warehouse where the product are stored.

Note: 

The receiving warehouse can be a regular warehouse or the point of usage warehouse attached to the next work cell.

If the receiving warehouse is point of usage, the item produced must be part of the material list for the production model manufactured at the work cell the warehouse is attached to.

The Supply System for the receiving point of usage warehouse must be set to none in the Item Data by Warehouse (whwmd2510m000).

Scheduling
Horizon

planning horizon

Minimum Run

The minimal quantity to start the repetitive production run.

Optimal Run

The optimal quantity for a repetitive production run.

Maximum Run

The maximum quantity to start the repetitive production run.

Operation
Schedule Line Quantity

The quantity assigned to the scheduled line.

Transfer Quantity

The quantity of materials that must be transferred to the point of usage warehouse, from the external supplier or warehouse.

Rate

The rate by man or machine hour.

# Labor Resources

The number of operators required for production.

Rejects
Repair
Repair Cell

repair cell

Lead Time

The repair time for the item expressed in hours.

Quarantine
Warehouse

ID of the warehouse designated for quarantine.

Location

Specify the location of the repair cell.