Copy Production Bill of Material (timfc3200m100)
Use this session to to copy a production bill of material revision to another product.
If the product to which the production bill of material is copied, has no P-BOM, or only has revisions with the status Approved or Expired, a new revision of the product is created with the status New.
If the product to which the production bill of material is copied has a P-BOM revision with a status New, this revision can either be overwritten or have the new bill of material added to this revision.
Field Information
- Product
-
The product ID.
- Revision
-
The P-BOM revision number.
- Effectivity Unit
-
effectivity unit
- Position
-
The position of the PBOM line.
- Product
-
The ID of the product the production bill of material is copied to.
- Revision
-
The production model revision number.
- Copy Method
-
The method by which the production bill of material is copied.
Allowed values
- Create
-
The revision is copied into a new revision of the target.
- Overwrite
-
The existing materials or operations of the target bill of material or routing are overwritten by the source revision. The materials or operations that do not exist in the source bill of material are not removed.
- Add and Renumber
-
The materials or operations of the source bill of materials are added to the target bill of materials.
- Exceptions
-
If this check box is selected, exceptions defined for the source production bill of material are copied.
- Reference Designators
-
If this check box is selected, reference designators defined for the source production bill of material are copied.
- Alternative Materials
-
If this check box is selected, alternative materials defined for the source production bill of material are copied.
- BOM Text
-
If this check box is selected, any text present on the source production bill of material is copied.