Production Bills of Material (timfc3100m000)
Use this session to manage production bills of material.
Using the P-BOM product can be manufactured in the job shop, subcontracting or repetitive manufacturing.
Field Information
- Product
 - 
            
The product for manufacture.
 - Revision
 - 
            
The revision of the bill of material.
 - Status
 - 
            
The status of the production bill of material.
Allowed values
- New
 - Approved
 - Expired
 
 - BOM Quantity
 - 
            
BOM quantity
 - Effective Date
 - 
            
The date the production bill of material becomes effective.
 - Expiry Date
 - 
            
The date the production bill of material is no longer effective.
 - Created By
 - 
                     
The name of the employee responsible for the creation of the PBOM.
 - Created On
 - 
                     
The date the PBOM was created.
 - Approved By
 - 
                     
The employee responsible for the approval of the production bill of material.
 - Approved On
 - 
                     
The date the production bill of material was approved.
 - Expired By
 - 
                     
The eployee responsible for expiring the production bill of material.
 - Expired On
 - 
                     
The date the production bill of material was expired.
 - Text
 - 
            
If this check box is selected, a text is available.
 - Source
 - 
            
The origin of the P-BOM.
Allowed values
- Manual
 - 
               
The P-BOM is defined in the Production Bills of Material (timfc3100m000) session.
 - Production Bill of Material
 - 
               
The P-BOM revision was generated from an existing production bill of material.
 - Engineering Bill of Material
 - 
               
The P-BOM is generated from an engineering bill of material.
Note: If the P-BOM is generated from an E-BOM, the Source Engineering Item and Source Revision fields are filled. - Configurator (PCF)
 - 
               
The P-BOM is generated from data imported from the PCF configurator.
 - Configurator
 - 
               
The P-BOM is generated from data imported from Infor Configurator.
 - PLM
 - 
               
The P-BOM is generated from data imported from PLM.
 - Job Shop Bill of Material
 - 
               
The P-BOM was generated from a job shop bill of material.
 - Not Specified
 
 - Source Engineering Item
 - 
            
The item for which the Engineering Bill of Material is defined.
Note: If the P-BOM is created by EDM based on an engineering item- Item Relationship, this field specifies the engineering item. - Source Revision
 - 
            
The revision of the engineering item bill of material.