Received Job Shop Bill of Material (tibom5605m000)

Use this session to manage the job shop bill of material received from PLM.

Field Information

Site

Select the site where the job shop bill of material will be used.

Site is

The site where the job shop bill of material is:

Allowed values

  • Controlled by PLM
Product

Select the product to which the job shop bill of material applies.

Product is

The product is:

Allowed values

  • Controlled by PLM
Bill of Material

The ID of bill of material (BOM) the job shop bill of material is derived from.

Bill of Material is

The job shop bill of material (BOM) is:

Allowed values

  • Controlled by PLM
Revision

The revision number of the selected bill of material (BOM).

Revision is

The bill of material (BOM) revision is:

Allowed values

  • Controlled by PLM
Status

The status of the job shop bill of material.

Allowed values

  • Created

    The job shop bill of material but has not yet been processed.
  • Processed

    The job shop bill of material has been processed and can be used.
  • Rejected

    The job shop bill of material has been rejected and must be reworded before it can be processed again.
Routing

The routing used for production based on the job shop bill of material.

Routing is

The routing used for the specified job shop bill of material is:

Allowed values

  • Controlled by LN
  • Controlled by PLM
BOM Quantity

The BOM quantity for the job shop bill of material.

BOM Quantity is

The specified BOM quantity is:

Allowed values

  • Controlled by PLM
BOM Text

If this check box is selected, bill of material text is present.

BOM Text is

The presence of BOM text is:

Allowed values

  • Controlled by LN
  • Controlled by PLM
Use for Planning

Specifies if the selected job shop bill of material is used for planning purposes.

Use for Planning is

Use in planning is:

Allowed values

  • Controlled by LN
Use for Costing

Specifies if the selected job shop bill of material is used for costing purposes.

Use for Costing is

Use in costing is:

Allowed values

  • Controlled by LN
Effective Date

The date the job shop bill of material becomes effective.

Effective Date is

The effective date is:

Allowed values

  • Controlled by PLM
Expiry Date

The date after which the job shop of material is no longer effective.

Expiry Date is

The expiry date is:

Allowed values

  • Controlled by PLM
Created By

The name of the employee who generated the job shop bill of material.

Created On

The date and time the job shop bill of material was created.

Processed By

The name of the employee who processed the job shop bill of material.

Processed On

The date and time the job shop of material was processed.

Rejected By

The name of the employee who rejected the job shop bill of material.

Rejected On

The date and time the job shop bill of material was rejected.