Received Job Shop Bill of Material Control Template (tibom5100m000)
Use this session to manage templates that specify which attributes of a PLM-BOM are controlled by PLM or LN.
- 
          
If no template is defined, the PLM-BOM is defined by the attributes as sent by PLM and no validation is possible. Without validation, it is not possible to generate a job shop bill of material.
 - Some attributes can only be controlled by PLM or controlled by LN.
 
Field Information
- Effective Date
 - 
            
The date the bill of material control template becomes effective.
 - Site
 - 
            
The site where the job shop bill of material is:
Allowed values
- Controlled by PLM
 
 - Bill of Material
 - 
            
The job shop bill of material (BOM) is:
Allowed values
- Controlled by PLM
 
 - Revision
 - 
            
The product revision is:
Allowed values
- Controlled by PLM
 
 - Product
 - 
            
The product is:
Allowed values
- Controlled by PLM
 
 - Routing
 - 
            
The routing used for the specified job shop bill of material is:
Allowed values
- Controlled by LN
 - Controlled by PLM
 
 - BOM Quantity
 - 
            
The BOM quantity of the specified job shop bill of material is:
Allowed values
- Controlled by PLM
 
 - Use for Planning
 - 
            
Specifies if the selected job shop bill of material is used for planning purposes.
Use in planning is:
Allowed values
- Controlled by LN
 
 - Use for Costing
 - 
            
Specifies if the selected job shop bill of material is used for costing purposes.
Use in costing is:
Allowed values
- Controlled by LN
 
 - Effective Date
 - 
            
The date the job shop bill of material becomes effective.
The effective date is:
Allowed values
- Controlled by PLM
 
 - Expiry Date
 - 
            
The date after which the job shop of material is no longer effective.
The expiry date is:
Allowed values
- Controlled by PLM
 
 - BOM Text
 - 
            
The presence of additional bill of material text is:
Allowed values
- Controlled by LN
 - Controlled by PLM
 
 - Position
 - 
            
The position in the production queue is:
Allowed values
- Controlled by PLM
 
 - Item
 - 
            
The item specifics are:
Allowed values
- Controlled by PLM
 
 - Warehouse
 - 
            
The warehouse from which the materials for production are taken is:
Allowed values
- Controlled by LN
 - Controlled by PLM
 
 - Lot Selection
 - 
            
The lot selection is:
Allowed values
- Controlled by LN
 - Controlled by PLM
 
 - Net Quantity
 - 
            
The net quantity is:
Allowed values
- Controlled by LN
 - Controlled by PLM
 
 - Scrap Percentage
 - 
            
The scrap percentage is:
Allowed values
- Controlled by LN
 - Controlled by PLM
 
 - Scrap Quantity
 - 
            
The scrap quantity is:
Allowed values
- Controlled by LN
 - Controlled by PLM
 
 - Size Unit
 - 
            
The unit of measurement for length and width is:
Allowed values
- Controlled by LN
 - Controlled by PLM
 
 - Length
 - 
            
The length of the material is:
Allowed values
- Controlled by LN
 - Controlled by PLM
 
 - Width
 - 
            
The width of the material is:
Allowed values
- Controlled by LN
 - Controlled by PLM
 
 - Number of Units
 - 
            
The required quantity of the material, expressed as the number of units of specified length and width is:
Allowed values
- Controlled by LN
 - Controlled by PLM
 
 - Operation
 - 
            
The operation is:
Allowed values
- Controlled by LN
 - Controlled by PLM
 
 - M-R Relations Present
 - 
            
The presence of material-routing relations is:
Allowed values
- Controlled by LN
 
 - Phantom
 - 
            
The use of phantom subassemblies as part of the job shop bill of material are:
Allowed values
- Controlled by LN
 - Controlled by PLM
 
 - Replaces Item
 - 
            
The replacement of items that are part of the job shop bill of material is:
Allowed values
- Controlled by LN
 - Controlled by PLM
 
 - Alternatives Present
 - 
            
The management of alternative materials is:
Allowed values
- Controlled by LN
 
 - Allow Multiple Alternatives
 - 
            
The division of the estimated material quantities over available material options is:
Allowed values
- Controlled by LN
 
 - Print on Order Document
 - 
            
The printing of bill of material component on the order document is:
Allowed values
- Controlled by LN
 
 - Standard Configuration
 - 
            
The job shop bill of material line being part of the standard configuration is:
Allowed values
- Controlled by LN
 
 - Exceptions Present
 - 
            
The presence of exceptions is:
Allowed values
- Controlled by LN
 
 - Reference Designator Present
 - 
            
The presence of reference designators is:
Allowed values
- Controlled by LN
 
 - Specify Material Offset
 - 
            
The lead-time offset is:
Allowed values
- Controlled by LN
 - Controlled by PLM
 
 - Material Offset
 - 
            
The material offset is:
Allowed values
- Controlled by LN
 - Controlled by PLM
 
 - Material Offset Unit
 - 
            
The time unit in which the material offset is calculated is:
Allowed values
- Controlled by LN
 - Controlled by PLM
 
 - Report Material
 - 
            
Material reporting is:
Allowed values
- Controlled by LN
 
 - Supplied by Subcontractor
 - 
            
Which materials are supplied by subcontractor is:
Allowed values
- Controlled by LN
 
 - Inherit Demand Peg
 - 
            
Demand pegs are:
Allowed values
- Controlled by LN
 
 - Customer Furnished Material
 - 
            
The use of customer furnished materials is:
Allowed values
- Controlled by LN
 
 - Contains Customer Furnished Material
 - 
            
The addition of customer furnished materials to the job shop bill of material is:
Allowed values
- Controlled by LN
 
 - Percentage Required
 - 
            
The percentage of raw material that must be available before the operation can be started is:
Allowed values
- Controlled by LN
 - Controlled by PLM
 
 - Inherit Warehouse if Product is used as Phantom
 - 
            
The inheritance of the warehouse if the parent item is a phantom is:
Allowed values
- Controlled by LN
 
 - Material Text
 - 
            
The material text is:
Allowed values
- Controlled by LN
 - Controlled by PLM