Planning Bills of Material (tiapl5126m000)

Use this session to view and maintain data for the planning Bill of Material (BOM) for an assembly forecast item.

Your Concept

Field Information

Forecast Item

The code of the forecast item.

Note: The item is applicable only if the Forecast Item Type is set to Product in the Items - Forecasting (tiapl5101m000) session.
Base Model

The code of the base model.

Note: 
  • This field is displayed only if the Base Models check box is selected in the Product Configuration Parameters (tipcf0100m000) session.
  • It is possible to define a planning BOM without a base model. Such a planning BOM is used when the main item is also part of another planning BOM.
Revision

The revision number of the BOM.

Status

The status of the BOM.

Allowed values

New
Approved
Expired
Effective Date

The date and time from which the BOM is effective.

Expiry Date

The date and time up to which the BOM is effective.

Source

The source of the BOM.

Allowed values

Manual

The P-BOM is defined in the Production Bills of Material (timfc3100m000) session.

Production Bill of Material

The P-BOM revision was generated from an existing production bill of material.

Engineering Bill of Material

The P-BOM is generated from an engineering bill of material.

Note: If the P-BOM is generated from an E-BOM, the Source Engineering Item and Source Revision fields are filled.
Configurator (PCF)

The P-BOM is generated from data imported from the PCF configurator.

Configurator

The P-BOM is generated from data imported from Infor Configurator.

PLM

The P-BOM is generated from data imported from PLM.

Job Shop Bill of Material

The P-BOM was generated from a job shop bill of material.

Not Specified
Note: By default, this field is set to Manual.
Created On

The date and time when the BOM is created.

Created By

The employee who creates the BOM.

Approved On

The date and time when the BOM is approved.

Approved By

The employee who approves the BOM.

Expired On

The date and time when the BOM is expired.

Expired By

The employee by who sets the BOM status is to Expired.