Planning Bills of Material (tiapl5126m000)
Your Concept
Field Information
- Forecast Item
 - 
            
The code of the forecast item.
Note: The item is applicable only if the Forecast Item Type is set to Product in the Items - Forecasting (tiapl5101m000) session. - Base Model
 - 
            
The code of the base model.
Note:- This field is displayed only if the Base Models check box is selected in the Product Configuration Parameters (tipcf0100m000) session.
 - It is possible to define a planning BOM without a base model. Such a planning BOM is used when the main item is also part of another planning BOM.
 
 - Revision
 - 
            
The revision number of the BOM.
 - Status
 - 
            
The status of the BOM.
Allowed values
- New
 - Approved
 - Expired
 
 - Effective Date
 - 
            
The date and time from which the BOM is effective.
 - Expiry Date
 - 
            
The date and time up to which the BOM is effective.
 - Source
 - 
            
The source of the BOM.
Allowed values
- Manual
 - 
               
The P-BOM is defined in the Production Bills of Material (timfc3100m000) session.
 - Production Bill of Material
 - 
               
The P-BOM revision was generated from an existing production bill of material.
 - Engineering Bill of Material
 - 
               
The P-BOM is generated from an engineering bill of material.
Note: If the P-BOM is generated from an E-BOM, the Source Engineering Item and Source Revision fields are filled. - Configurator (PCF)
 - 
               
The P-BOM is generated from data imported from the PCF configurator.
 - Configurator
 - 
               
The P-BOM is generated from data imported from Infor Configurator.
 - PLM
 - 
               
The P-BOM is generated from data imported from PLM.
 - Job Shop Bill of Material
 - 
               
The P-BOM was generated from a job shop bill of material.
 - Not Specified
 
Note: By default, this field is set to Manual. - Created On
 - 
            
The date and time when the BOM is created.
 - Created By
 - 
            
The employee who creates the BOM.
 - Approved On
 - 
            
The date and time when the BOM is approved.
 - Approved By
 - 
            
The employee who approves the BOM.
 - Expired On
 - 
            
The date and time when the BOM is expired.
 - Expired By
 - 
            
The employee by who sets the BOM status is to Expired.