Overview
Manufacturing Control (MFC)
Engineering
Engineering Data Management (EDM)
Engineering data management summary
Engineering items
Engineering BOMs
Changing EBOMs - Manual procedure
Changing EBOMs - Semi-automatic procedure
Changing EBOMs - Automatic procedure
Copying E-items to items
Finalizing engineering data
Unit effectivity in EDM
Engineering BOM for assembly production
Engineering Item Revision
Displaying Engineering BOM
Maintaining EBOM Copy Data
Generating EBOM Copy Data (Multilevel)
Including/Excluding E-Items
Defining E-item by MBC
Processing EBOM Changes
Generating Item Engineering Data (GBF)
Item Production Data (IPD)
Assembly Print Sessions
Printing Financial Transactions by Assembly Line
Printing Exchangeable Configurations
Printing Work Instructions
Printing Line Station Orders (Bar Code)
Printing Line Station Orders (Bar Code) directly from the UNIX print queue
Printing Assembly Part Shortage
Printing Costing by Assembly Order or Assembly Line
Assembly Control
Miscellaneous
Displaying and Handling Process Triggers
Assembly Parts
Viewing Assembly Part Shortage - Assembly Orders
Transferring Assembly Part Supply Transfer Messages
Viewing Assembly Part Supply Transfer (SILS)
Viewing Assembly Order - Assembly Part Shortages
Checking Inventory
Assembly Orders
Offline dates
Purging State - dependent ASC Data
Purging State - independent ASC Data
Rescheduling Assembly Orders
Viewing Assembly Order - Blocking Reasons
Closing Assembly Orders
Divergent Assembly Lines
Using Line Segment - Exchangeable Configurations
Statuses in production synchronous schedules (PSS)
Viewing Line Segment - Line Rules
Displaying Line Segment - Stations
Displaying Line Segment - Line Sequence
Displaying Line Segments
Clustering Line Station Order
Reporting Line Station Order Complete Using Bar Code
Updating Line Station Variant - Assembly Part Supply Data
Displaying Assembly Line - Assignments
Displaying Assembly Line - Assignments and Line Stations
Displaying Assembly Line - Status
Linking Effectivity Unit - Process Variables
Generating Assembly Order Lists for Critical Parts
Viewing Workload Analysis
Line Stations
Viewing Line Station - Assembly Orders
Viewing Option Combination - Expressions
Reference numbers in production synchronous schedules
Clustering Line Station Order - Assembly Part Requirements
Assembly assignment
Remixing Line Mix
Processing Trigger Definition
Displaying Assembly Lines
Assembly Line Supervisor Workbench
Assembly Line Supervisor Workbench
Lines and Orders section
Lines and Orders section features
Line Sequence section
Line Sequence section features
Line Sequence Details
Line Structure section
Assembly Line Supervisor Workbench - User Settings
Job Shop Control
Production Orders
Changing order status
Resetting Production Order Status
Subcontracting Operations
Building Utilization
Delivery of finished products
Reporting Production Schedules Completed
Avoiding shortages on production orders
Reporting Operations Completed or Rejected
Reporting Orders Completed
Manually Backflushing Materials and Hours
Processing Material Shortages
Reporting Orders Completed by Order Group
Canceling Range of Production Orders
Subcontracting WIP Amounts
Serial numbers and production order completion
To reuse the standard items
Adding or removing production orders to or from an order block
Labels
Labels
Labels in Manufacturing
Setup Classes and States
Backgrounds on setup classes and setup states in LN
To define setup classes and setup states
Order Documents
Using order documents
Contents of order documents
Printing Production Order Documents
Miscellaneous
Displaying Order Distribution
Adding Production Order To Order Block
Printing Shortages by Production Order
Checking Inventory by Production Order
Printing Relative Work Center Utilization
Printing Production Order Planning by Priority
Displaying Work-in-Process
Production Order Planning
Display Production Planning
Altering Operation Relationships by Order
Shifting Production Planning
Reprocessing Production Orders
Rescheduling Production Orders
To calculate production times of operations
To calculate remaining production time
To determine on order dates
Using Planning Board
Planning board
Queue time compression
Production order lead-times (transfer batch quantity)
Displaying Materials to Issue for Production Orders
Production order splits - overview
Operation Planning Example
Order Sequencing with Order Blocks
Order-block planning
Ordering Block Planning
To set up order-block planning
To plan with order blocks
Rescheduling order blocks
To split off part of an order block
Generating Order Block Planning
Production Input/Output Monitoring
Checking Work Centers Dashboard
Utilization
Displaying Work Center Utilization by Week
Displaying Shared Work Center Utilization
Displaying Shared Work Center Utilization by Day
Work Center I/O Control
Generating Work Center Input/Output Control
Machine I/O Control
Generating Machine Input/Output Control Data
Production Control
Operations
Reporting as completed
Reporting quantities as completed and rejected
Reporting main item or semifinished item quantities
Operation status
Operation status values
Blocking operations
Order Grouping
Order grouping
Creating Production Order Groups
Material
Scrap and Yield
Scrap and yield
Scrap
Yield
Defining scrap and yield
Yield type and quantity extra
Examples of yield
Phantoms
Phantoms
Defining phantoms
Renumbering phantom operations
Adding and exploding phantoms in a production order
Material Issue
Miscellaneous
To set up shop floor warehouses
Listing Estimated Materials
Collecting backflush materials from the warehouse
Defining alternative materials
Planned quantity to manufacture
WIP transfer
Example of estimating materials
Calculating net quantity
Sequence of estimated material lines
Effective date of materials and operations
Multilevel material shortage check
Direct processing of material shortages
Quality Management
Defining blocking reasons for Quality
Using QM for manufacturing operations
Quality control of end products
Quality control of materials
To set up inspection methods for operations
Inspection methods for end products
Inspection methods for materials
Machine Group Utilization
Machine Utilization Workbench
Machine Utilization Workbench Header
Machine Utilization Workbench Gantt Section
Machine Utilization Workbench User Settings
Labor Utilization Graph Workbench
Labor Utilization Graph Header
Labor Utilization Graph Gantt section
Labor Utilization Graph user settings
Machine Workbench
Machine workbench overview
Machine workbench toolbar
Machine section
Machine operations section
Job Shop Planning Board
Job Shop Planning Board toolbar
Job Shop Planning Board user settings
Job Shop Planning Board Workbench Gantt
Job Shop Planning Board Workbench Material Availability
Job Shop Planning Board Workbench Capacity
Subcontracting
Overview of subcontracting
Subcontracting diagram
Generating subcontracting purchase orders
Project Control
Project Control (PCS)
Copying Standard Production Structure to Customized Structure
Copying Customized Product Structure to Customized Structure
Copying Customized Product Structure to Standard Structure
Deleting Customized Product Structure
Printing Project Work - in - Process
Maintaining the Capacity Load Table
Exporting/Importing PCS Activities via XML
Aggregating Estimated Capacity to Project
Generating Network Messages
Module Planning - Overview
To define setup classes and setup states for product features
Critical Path
Data mapping: import data from Microsoft Project to PCS
Modifying Engineering Item Revision
PCS - Microsoft Project integration
Integration between PCS and Microsoft Project
Data mapping: export data from PCS to Microsoft Project
Product Configuration
PCF procedures
Costing
Cost Calculation Code
Standard and actual cost warehouses
Calculating Estimated End Item Unit Costs
Printing Differences between Frozen and Current Estimated Costs
Printing Production Order Costing Overview
Production order calculation topics
Calculating Resources
Costing breaks in Enterprise Planning and Manufacturing
Aggregated cost components
Lower of cost or market value
Antedating
Surcharges as financial transaction
Bill of Material
Bill of Material (BOM)
Structure of a multilevel BOM
Replacing Item in Bill of Material
Structure of a single-level BOM
Structure of a summarized BOM
Copying Bill of Material
Copying Bill of Material
Defining the Bill of Material
Printing where-used BOM components (single level)
Multilevel BOM
Engineering BOMs
Engineering BOMs
Defining and Modifying Engineering Item
Listing MBC Actions
Displaying MBC
Maintaining Engineering Item - Item Relationship
Displaying EBOM and PBOM Consistency
Displaying, Defining and modifying MBC
Product Variants
Displaying Product Variants
Viewing Product Variant Structures
Purging Product Variants
Reference Designators
Procedure for linking reference designators in the BOM
Procedure for linking reference designators in the EBOM
Reference designators and MBCs
Routing
Routing
Microrouting
Setting up a microrouting
Updating Routing Operations
Defining Assembly Line Surcharges
Defining Process Variables
Indicating Task Relationships
Linking Operation (Step) - Instructions
Update check Planned by Planner Consistency
Printing Posted Production Results by Work Center
Purging and Renumbering Sequences
Displaying Financial Transactions
Generating Time Horizon - driven SILS Supply Messages
Replenishing Shop Floor Warehouse
Workbench Navigation
Work Centers
Work centers
To define shared work centers
Shared work centers
Assigning Shared Work Center Relationships
Capacity/Hours
Calculating basic week capacity by resource unit
Calculating Basic Day Capacity by Resource Unit
Calculating man/machine hours
Calculating production rate and cycle time from a norm table
Calculating based on norm tables
How to calculate available capacity
Recalculation of cycle time when changing man occupation or machine occupation
Calculating hours accounted through backflushing
Input / output control
Calculating bottleneck work center and rate
Rough capacity consumption in PCS
Serialized Items
Serialized items in Manufacturing
Working with serialized items in Manufacturing
Serialized items in the job shop - manual status handling
Serialized items on the job shop - automatic status handling
To maintain as-built headers and as-built components
Rework order procedure for serialized items
Integrations
Integration Manufacturing and Document Management
Integration between PCS and Microsoft Project
Data mapping: export data from PCS to Microsoft Project
Miscellaneous
Multi currency
Import CAD application data with the Exchange module
Hours accounting procedure
Processing backflushed hours
Bar codes for Windows NT
Glossary
activity manager
actual capacity
actual completion date
actual input
actual output
actual queue
added costs
aggregate
aggregation relationships
allocation
alternative material
alternative tool type
anonymous item
answer
answer group
antedating
aspect
assembly assignment
assembly item
assembly line
assembly-material issue note
assembly part
assembly routing sheet
available capacity
average setup time
backflushing
backlog
base unit
basic capacity
bill of critical capacities
bill of critical materials
bill of material (BOM)
blocking reason
BOM level
BOM quantity
BOM sequence number
bottleneck work center
bucket
budget
buffer
buffer (FIFO)
buffer (random access)
bus component
calculation group
calculation GRT
calculation office
calculation office variance
calibration interval
capacity unit
checklist
classification
clustered line station order
collect cost component
collective cutting list
collective sawing list
compile
completion date
constraint
constraint
constraint
constraint identification code
constraint validation message
constraint validation message
container
cost calculation code
costing work center
cost item
count point
covering note
CPQ Configurator
critical BOM level
critical work center
current operation
customized item
cutting list
cycle time
delivery date
demonstrated load factor
depreciation code
desired queue
detailed cost component
disaggregate
earliest finish date
effective date
effective date
efficiency variances
end item
engineering item
engineering item relationships
engineering module
enterprise planning order group
estimated quantity
exchangeable configuration
exponential smoothing
family
family structure
FAS item
feature
feature
finalize
fixed costs
fixed duration
flatten
float time
floor stock
freeze
generic item
generic price list
inspection note
inspection point
instrument
item subcontracting
item surcharge
Kanban label
labor hours
lead time
lead-time offset
lifetime serial number
line mix
line segment
line sequencing
line station
line station order
line-station variant
list of materials
machine
machine capacity group
machine hours
machine number
machine type
main assembly line
main item
main work center
mass BOM change
master company
material
material issue note
material list
mathematical operator
microrouting
minimum order quantity
module
module planning
move time
moving average
multilevel bill of material
multipiece tool
net quantity
network planning
normal capacity
norm table
norm time
norm unit
offset
offsetting
operation
operation note
operation rate
operation rate code
operation set
operation status
operation step
operation subcontracting
option
option combination
option set
order block
order costs
order interval
order quantity increment
Overall Equipment Effectivity
parallel assembly operations
partial delivery
penalty cost
person hours
phantom
physical location
pivot segment
plan group
plan item
plan level
planned input
planned offline date
planned output
planned queue
planning percentage
point of usage
price list matrix
price variances
primary work center
process-triggered workflow
process variable
product
product expiry date
product family
production BOM
production department
production item
Production Line Model
production model
production order
production order status
production rate
production schedule
production time
product model
product structure
product variant identification code
product variant structure
project
project activity
project item
project part
project structure
quantity extra
quantity ordered
quantity planned input
quantity planned output
question
queue deviation
queue time
receipt note
receiving site
reference designator
reference operation
reference type
refurbishing
rejected item
repair cell
repetitive item
repetitive manufacturing
requested offline date
rescheduling message
result
return value
revision
revision-controlled
rework order
roll-off line
routing
routing code
routing quantity
routing sheet
rule
run time
safety time
sales price structure
sawing list
scheduling area
scrap
secondary work center
segment schedule
semifinished item
setup class
setup class
setup class state
setup state
shared work center
shop floor warehouse
shrinkage
simulated purchase prices
simulation
single-level BOM
slack time
standard configuration
standard cost
standard cost surcharge
Standard cost valuation method
standard item
standard-to-order (STO)
subassembly
subcontracting
subcontracting note
subcontracting purchase order
subcontracting rate
subcontracting rate factor
sub-item
sub plan item
subsequent delivery
summarized BOM
supplying assembly line
supply in line sequence
surcharge
surcharge base
target period
task
test
time fence
time unit
tool
tool component
tool kit
tool life
tool number
tool request
tool request details
tool serial number
tool type
transfer batch quantity
use-up material
utilization
valid
validity
valuation price
variable costs
wait time
warehouse transfer
WIP transaction
WIP transfer
work cell
work center
work in process
yield
yield type
Open link in new tab