Material Lines Prioritizing Example
Suppose you have two production orders, PR001 and PR002, as shown in the following figure. Both production orders require component C as material.
PR001
You need a quantity of material C in operation 15 and another quantity of C for operation 20.PR002
Material C is required in operation 12.
If you set this field to Material Allocation Date, this session processes the estimated materials in the order by which the materials are allocated:
- The materials for PR001, operation 15
- The materials for PR002, operation 12
- The materials for PR001, operation 20
If you set this field to Production Order Start Date, this session processes the estimated materials in the following order:
- All materials for PR001, because this production order is started first. These materials are ordered by estimated-material position, including the lines linked to operations 15 and 20.
- All materials for PR002, also ordered by estimated-material position, including the lines linked to operation12.