Checking Use-up Material Definitions
In the Use Up and Alternative Materials (tibom0150m100) session you can checks the items, according to the following procedure:
- LN identifies the items that are part of the item range you entered and that are defined as a material of a bill of material (BOM) in the Job Shop List of Material (tibom3610m000) session.
- From these items, LN selects the items for which the Planner field in the Items - Ordering (tcibd2100m000) session names a planner that is part of the range of shop floor planners that you entered.
- From these items, LN selects the items for which a date is recorded in the Last Allowed Order Date field. (These items have been phased out or will be phased out).
- For each of these items, LN checks if the last allowed order date is not before the date in the Expiry Date field of the BOM line.
- If the last allowed order date is before the expiry date, LN checks if the BOM line has any alternative materials.
- If the last allowed order date is before the expiry date and no alternative materials are present for a BOM line, the BOM line is specified in an error report.