Replacing outdated materials and designating use-up materials in JSBOMs
This topic describes how to replace an outdated material with a replacement material in a job shop bill of material (BOM) and specify the outdated material as a use-up material.
Note:
If you use Engineering Data Management to control changes in a BOM, this procedure does not apply.