Budget Structure History (tfbgc1632m000)
Use this session to view the history of the budget structure.
Field Information
- Budget Year
 - 
            
The year for which the budget is valid. The year corresponds to the fiscal year defined in the General Ledger module.
 - Budget
 - 
            
The budget code.
 - Budget Level
 - 
            
The budget level. For a budget structure, you can define up to nine summary levels.
- Level 1 of a roll up structure always determines how the accounts on your ledger chart of accounts (ledger detail accounts) roll up to the first summary level of budget accounts.
 - Levels 2 through 9 always determine additional summary levels within your budgetary roll up structure. Allotment, commitment, encumbrance, expense, payment, and available balances on levels 2 through 9 are always the sum of the balances of the level immediately below these levels ( Example, the balance at Level 2 always equals the sum of the balances of the budget accounts at Level 1).
 
 - Modified on
 - 
            
The date and time when the budget structure was modified.
 - Modified by
 - 
            
The name of the user who changed the budget structure.
 - History Status
 - 
            
The status of the budget structure history.
 - 
            
- Account
 - 
                     
The budget account code.
 - Dimension 1
 - 
                     
The dimension.
 - Description 1
 - 
                     
The description of the budget account.
 - Description 2
 - 
                     
The second description of the budget account.
 - Template
 - 
                     
If this check box is selected, the budget structure is used as a template. Every combination in the range of selected ledger accounts and dimension codes will generate a budget account with the same syntax. The mapping to the combination of ledger account and dimension codes is done simultaneously.