Date-Effective Supply Source (tcibd0510m000)
Use this session to list the date-effective supply sources (default and actual) of Purchased, Manufactured, or Product items.
You can temporarily change the default supply source of the items in the Date-Effective Supply Source (tcibd0110s000) details session.
Field Information
- Item
 - 
            
item
 - Position
 - 
            
The line position number.
 - Effective Date
 - 
            
The effective date of the supply source on this line.
 - Expiry Date
 - 
            
The expiry date of the supply source on this line.
 - Default Supply Source
 - 
            
The default supply source determines the default supply method for the item when the inventory on hand is not sufficient.
Note: You can temporarily change the supply source of Purchased, Manufactured or Product items in the Date-Effective Supply Source (tcibd0510m000) session.Allowed values
- Job Shop
 - 
               
A bill of material (BOM) and routing are available for the item. The demand is filled by a production order.
 - Repetitive
 - 
               
A list of materials and a work cell are available for the item. The demand is filled by a production schedule.
 - Assembly
 - 
               
An assembly bill of material (BOM) and assembly lines are available for the item. The demand is filled by an assembly order.
 - Purchase
 - 
               
No production data is available for item. The demand is filled by a purchase order.
 - Subcontract
 - 
               
The item is supplied by subcontracting the production process. A bill of material (BOM) is specified for this item.
Note: The Subcontracting with Material Flow check box must be selected to select this supply source. - Distribution
 - 
               
The item is supplied by a planned distribution order.
 
 - Actual Supply Source
 - 
            
The supply source that is used to replenish the inventory on hand for the current date.
Allowed values
- Job Shop
 - 
               
A bill of material (BOM) and routing are available for the item. The demand is filled by a production order.
 - Repetitive
 - 
               
A list of materials and a work cell are available for the item. The demand is filled by a production schedule.
 - Assembly
 - 
               
An assembly bill of material (BOM) and assembly lines are available for the item. The demand is filled by an assembly order.
 - Purchase
 - 
               
No production data is available for item. The demand is filled by a purchase order.
 - Subcontract
 - 
               
The item is supplied by subcontracting the production process. A bill of material (BOM) is specified for this item.
Note: The Subcontracting with Material Flow check box must be selected to select this supply source. - Distribution
 - 
               