ASC - use up material

The Use Up Material logic has been extended to Assembly Control. This new enablement is tied to the bill of material of Engineering Modules. When specifying the list of materials for an Engineering Module, use up materials can now be defined for each bill of material’s component in the Assembly BOM and Operations (tiapl2520m000) session.

Use Up materials can also be specified, maintained and retrieved from the Engineering Data Management (EDM) module, if Engineering Modules maintenance is performed in this module. When using this functionality, during Assembly Part Requirement Calculation and Allocation, the use up material is planned to be used up until its inventory level reaches the minimum level of quantity.