Sales schedule line requirement type
A requirement type represents a requirement in time, used for scheduling.
On a sales schedule line, the following requirement types can be communicated:
-
Immediate
These schedule requirements have a start date in the past at the time of creation. As a result, an underdelivery is applicable. These requirements must be shipped as soon as possible. -
Firm
These schedule requirements are handled as actual orders that can be shipped. -
Planned
These schedule requirement are sent to you for planning purposes only.
Schedule types and requirement types
The Use Contracts for Schedules check box in the Sales Schedule Parameters (tdsls0100s500) session determines from which session LN retrieves the data to determine the type of sales schedule and the requirements that can be received.
-
Use Contracts for Schedules is cleared
Data is retrieved from the Items - Sales Business Partner (tdisa0510m000) session. -
Use Contracts for Schedules is selected
Data is retrieved from the Sales Contract Line Logistic Data (tdsls3102m000) session.
Items - Sales Business Partner (tdisa0510m000)
The Requirement Type is determined as follows:
Schedule Type | EDI Message | Requirement Type |
Shipping Schedule | Shipping Schedule only | Firm or Immediate |
Material Release | Shipping Schedule or Sequence Shipping Schedule | Planned |
Material Release | Material Release | Depends on the Transaction Time Fence |
Sales Contract Line Logistic Data (tdsls3102m000)
The Requirement Type is determined as follows:
Schedule Message Types | Schedule Type | Requirement Type | ||||
Use Material Release | Use Material Release for Firm Requirements | Use Shipping Schedule | Use Sequence Shipping Schedule | Use Pick-up Sheet | ||
yes | no | yes | yes | yes | Shipping Schedule or Sequence Shipping Schedule | Firm or Immediate |
yes | no | yes | yes | yes | Material Release | Planned |
yes | yes | not applicable | not applicable | not applicable | Material Release | Depends on the Transaction Time Fence |
no | no | yes | not applicable | not applicable | Shipping Schedule | Firm or Immediate |
no | not applicable | no | yes | no | Sequence Shipping Schedule | Firm or Immediate |
no | no | not applicable | not applicable | yes | Shipping Schedule | Firm or Immediate |
Transaction Time Fence
If you only use material releases, the Requirement Type depends on the value of the Transaction Time Fence field.
-
All Lines
The Requirement Type is Firm -
Lines in the FAB Period
If the sales schedule line's Start Date is before the FAB period's end date, the Requirement Type is Firm. - If the sales schedule line's Start Date is after the FAB period's end date, the Requirement Type is Planned.
-
Lines in the Firm Period
The Requirement Type is equal to the Customer Requirement Type.
Legend
- The Transaction Time Fence is specified in the Items - Sales Business Partner (tdisa0510m000) and Sales Contract Line Logistic Data (tdsls3102m000) sessions.
- The EDI Message is specified in the Items - Sales Business Partner (tdisa0510m000) session.
- The Schedule Message Types are specified in the Sales Contract Line Logistic Data (tdsls3102m000) session.
- The Schedule Type is specified in the Sales Schedules (tdsls3111m000) session.
- The Customer Requirement Type is specified in the Sales Schedule Lines (tdsls3107m000) session.
- The FAB period is the sales schedule's Generation Date as specified in the Sales Schedules (tdsls3111m000) session plus the number of days as specified in the FAB Period field of the Items - Sales Business Partner (tdisa0510m000) or Sales Contract Line Logistic Data (tdsls3102m000) sessions.