Companies by Data Upgrade Run (ttspt2510m000)

Use this session to display the companies linked to the data upgrade run. The companies are linked during the initialization of the run.

Actions/Reference menu

These options are available:

Data Upgrade Tasks

Starts the Data Upgrade Tasks (ttspt2520m000) session.

Move Companies to Another Run

Starts the Move Companies to Another Run (ttspt2210m000) session.

Field Information

Package Combination

The package combination for which the data upgrade run will perform an upgrade.

Run Number

The run number of the data upgrade run.

Company

The company for which the data upgrade run will perform an upgrade.

Real Run Status

The actual run status of the company.

Possible values

Created The run was created by an external process, such as a PMC Feature Pack installation.
Initialized The detailed data about the upgrade programs has been retrieved and is stored in the Data Upgrade Tasks (ttspt220) table.
Running The run is busy. No failing upgrade programs have been detected yet.
Running with Failures The run is busy. One or more failing upgrade programs have been detected.
Failed The run finished with failures. Some upgrade programs may not have been executed because a pre-requisite failed.
Partially completed The run finished without failures. Not all companies in the range have been processed, or the user stopped the process.
Completed All upgrade programs succeeded. The upgrade is still running for physical companies.
Released All upgrade programs succeeded.
Attention Needed

If this check box is selected, the company has one or more upgrade tasks that require additional actions.

Creation Date

The date and time the run was created for the company.

Initialization Date

The date and time the run was initialized for the company.

First Start Date

The date and time the run was executed for the first time for the company.

Last Failure Date

The date and time the last failure occurred during execution of the run for the company.

Release Date

The date and time the run was finished for the company.

Simulation Run Status

The status of the simulation run.

Possible values

Attention Needed

If this check box is selected, the company has one or more upgrade tasks that require additional actions.

Creation Date

The date and time the simulation run was created for the company.

Initialization Date

The date and time the simulation run was initialized for the company.

First Start Date

The date and time the simulation run was executed for the first time for the company.

Last Failure Date

The date and time the last failure occurred during execution of the simulation run for the company.

Release Date

The date and time the simulation run was finished for the company.