Data Upgrade Runs (ttspt2500m000)
Actions/Reference menu
These options are available:
-
Starts the Companies by Data Upgrade Run (ttspt2510m000) session.
-
Starts the Data Upgrade Tasks (ttspt2520m000) session.
-
Starts the Initialize Data Upgrade Run (ttspt2200m000) session.
-
Starts the Data Upgrade Engine (ttspt2201m000) session.
-
Starts the Print Data Upgrade Run Information (ttspt2400m000) session.
Field Information
- Package Combination
-
The package combination for which the data upgrade run will perform an upgrade.
- Run Number
-
The run number of the data upgrade run.
- User
-
The user that created the run.
- Simulation Size
-
The maximum number of records to be processed by each upgrade program in simulation mode. If the Simulation Size is 0, all records will be processed.
- Path Logfile(s)
-
The path where the reports generated by the upgrade programs will be stored.
- Number of Servers
The number of additional bshells that will be used to run the Data Upgrade Engine. Additional bshells can improve the performance of the DUE because several upgrade tasks can be started in parallel.
See Performance and finetuning (OP).- Use Scheduler Server to Run Upgrade Tasks
-
If this check box is selected, the current bshell, where this session is started, does not only schedule the upgrade tasks but also runs upgrade tasks.
Note: See Performance and finetuning (OP)..If this check box is cleared, the current bshell only schedules the upgrade tasks.
- Real Run Status
-
The status of the run.
Possible values
Created The run was created by an external process, such as a PMC Feature Pack installation. Initialized The detailed data about the upgrade programs has been retrieved and is stored in the Data Upgrade Tasks (ttspt220) table. Running The run is busy. No failing upgrade programs have been detected yet. Running with Failures The run is busy. One or more failing upgrade programs have been detected. Failed The run finished with failures. Some upgrade programs may not have been executed because a pre-requisite failed. Partially completed The run finished without failures. Not all companies in the range have been processed, or the user stopped the process. Released All upgrade programs succeeded. - Attention Needed
-
If this check box is selected, the run has one or more upgrade tasks that require additional actions.
- Creation Date
-
The date and time the run was created.
- Initialization Date
-
The date and time the run was initialized.
- First Start Date
-
The date and time the run was executed for the first time.
- Last Failure Date
-
The date and time the last failure occurred during execution of the run.
- Release Date
-
The date and time the run was finished.
- Simulation Run Status
-
The status of the simulation run.
Possible values
- Attention Needed
-
If this check box is selected, the simulation run has one or more upgrade tasks that require additional actions.
- Creation Date
-
The date and time the simulation run was created.
- Initialization Date
-
The date and time the simulation run was initialized.
- First Start Date
-
The date and time the simulation run was executed for the first time.
- Last Failure Date
-
The date and time the last failure occurred during execution of the simulation run.
- Release Date
-
The date and time the simulation run was finished.