Calculate Execution Dates for Job (ttaad5408m000)

Use this session to calculate future job execution dates based on the calendar, period, and job scheduling lines from the specified start date to the end date. The resulting report can be used to verify the setup of your job.

The report includes this information:

  • Header data: Shows the specified Job , Start Date , and End Date .
  • Current Date: The planned execution date and time for the job. The first line in the report uses the Start Date as the current date, but calculates the new date (next planned execution date in the future) from the report generation date. Each subsequent report line takes the New Date of the previous line as its Current Date.
  • New Date: The next planned execution date for the job. The first line in the report uses the Start Date as the current date, but calculates the new date (next planned execution date in the future) from the report generation date. Each subsequent report line takes the New Date of the previous line as its Current Date.
  • Type: The scheduling type for the job scheduling line, such as every, daily, weekly, or monthly. If left blank, the calculation is based on a period.
  • Description: The description of the job scheduling line.
  • Details: Additional information such as a description of the job.

Field Information

Job
Select a job.
Start Date
The start date and time from which the planned execution dates are calculated.
End Date
The end date and time up to which the planned execution dates are calculated.