Routing by site
If the Job Shop by Site parameter is set to Active in the Implemented Software Components (tccom0100s000) session, the routing is defined by site.
These changes are applicable for a routing:
- It has a header and a status.
- It is always revision controlled.
- It can be designated for planning and for costing.
- The effective dates have been moved from the operations to the header.
- The routing quantity has been moved from item production data to the header.
- The task in the operation has been replaced by the reference operation.
- The machine in the operation has been replaced by the machine type.
- The visibility of the cycle time, number of machines, and process time have been improved.
- The labor resource has been decoupled from the machine resource.