Multisite production for job shop
If the Job Shop by Site parameter is set to Active in the Implemented Software Components (tccom0100s000) session, the production of a product can be planned and controlled in different sites, in different ways. For example, the production method, materials used, logistic handling, and the standard cost can differ by site.
This diagram shows an example: