|   | Shipment building based on shipment referenceShipment building is the process that automatically creates
		shipments based on picked outbound advices. The shipment building criteria are: - Ship-from Type, Ship-from Code, Ship-from Address
 - Ship-to Type, Ship-to Code, Ship-to Address
 - Planned for Load Plan (Y/N)
 - Manual Shipment (Y/N)
 - Office
 - Office Company
 - Route
 - Terms of Delivery
 - Point of Title Passage
 - Motive of Transport
 - Carrier
 - Planned Delivery Date
 - Delivery Point
 - Shipment Reference
 
 The shipment reference determines, among other criteria, how the
		goods picked from the supplier warehouse are grouped into shipments. The items
		on sales schedule lines that have the same shipment reference must be shipped
		as one shipment to the customer. In the automotive business this is called a
		Pickup Sheet (PUS) process. The shipment reference is primarily populated for
		warehouse orders with origin Sales Schedule. The value of
		the shipment reference is passed from Order Management to Warehousing by the Shipment Reference field in the Sales Schedule Planned Warehouse Orders (tdsls3520m000) session. Based on the Shipment Reference, these
		  shipment building parameters are available in the Warehousing Order Types (whinh0110m000) session: - Unique Shipment Reference per Shipment
 - Single Shipment Reference per Shipment
 
 Unique Shipment Reference per Shipment If this check box is selected, LN creates a unique shipment for each shipment reference number.
		  Creation of multiple shipments for the same shipment reference is not allowed
		  in the following cases: The Ship-to business partner of the shipments is
			 same. The Ship-to business partner is different, but shipments
			 have the same Sold-to business partner. Conversely, this means that when the
			 ship-to BP’s differ and their related sold-to BP’s differ, LN allows the same
			 shipment reference for creation of multiple shipments. 
 This parameter has the following consequences: The Shipment Reference criterion
			 overrules the shipment building criterion for Planned Delivery
			 Date. When the planned delivery date is not the same for all
			 schedule lines, but the schedule lines have the same shipment reference, LN creates one shipment
			 that contains all the schedule lines for this shipment reference. LN does not create outbound advices and shipment lines for pickup sheet
			 lines that have full shortage of items. Other lines of the same
			 pickup sheet can be picked and shipped. The outbound line for which the
			 shortage of items occurred remains open and has the pickup sheet number of the
			 already shipped pickup sheet. Processing of this remaining outbound line can
			 result in a shipment that has the already used pickup sheet number. You can
			 cancel the schedule line or provide the schedule line with a new pickup sheet
			 number. 
 Note If a confirmed shipment already exists for the same shipment
			 reference, LN stops the
			 creation of the shipment and displays an error message. Splitting/composing shipments must not result in multiple
			 shipments per pickup sheet number and vice-versa. If shipment composition
			 results in duplicate pickup sheet numbers, LN stops the creation
			 of shipments and displays an error message. 
 Single Shipment Reference per Shipment If this check box is selected, LN allows creation of multiple shipments for the same Shipment Reference. This parameter has the following
		  consequences: For two shipment lines that have the same shipment reference
			 and different planned delivery dates, LN creates two shipments that have the same shipment
			 reference. Outbound Lines that have different shipment reference
			 numbers are put on different shipments. If other shipment building criteria allow, outbound lines
			 that have the same shipment reference number are put on the same shipment.
			 Otherwise, outbound lines are put on separate shipments. 
 The shipment reference scenarios | Contents Existing Shipment
				Header | Shipment Reference Outbound Line | Related Order Type is Single Reference | Action | 
|---|
 | Single
				Reference=No, Shipment Reference= empty | empty | no | Add to
				Shipment |  | empty | yes | Add to Shipment |  | AAA | no | Add to Shipment |  | AAA | yes | Create New Single
				Reference Shipment |  | Single
				Reference=No, Shipment Reference= AAA In this scenario, the shipment reference
				at the shipment header is manually filled by the end-user. | empty | no | Add to
				Shipment |  | empty | yes | Add to Shipment |  | AAA | no | Add to Shipment |  | AAA | yes | Add to shipment if
				all shipment lines have reference "AAA" and make it a single reference
				shipment, otherwise create new single reference shipment |  | BBB | No | Add to Shipment |  | BBB | Yes | Create New Single
				Reference Shipment |  | Single
				Reference=Yes, Shipment reference= AAA | empty | no | create new
				shipment |  | empty | yes | create new shipment |  | AAA | no | Add to Shipment |  | AAA | Yes | Add to
				Shipment |  | BBB | No | Create new shipment |  | BBB | Yes | Create New Single Reference
				Shipment |  | Single Reference=Yes,Shipment
				Reference=Empty | Not Applicable |  |  |  
   Freight integration The Shipment Reference field which, among others, is used
		for the Pickup Sheet process, is transferred from the Outbound Order Lines (whinh2120m000) session to the corresponding freight order if Freight is
		implemented. In the Freight package, this shipment reference must be taken into
		account, if filled, as a Shipment Building criterion
		during the Load Building procedure through the Generate Plan (fmlbd0280m000) session. That is, if the Single Shipment Reference per Shipment check box is
		selected and the Generate Plan (fmlbd0280m000) session is run, multiple
		shipments must be generated if different shipment references are applicable,
		even though these shipments are to be delivered at the same destination address
		at the same time, that is, within the same load. If the Unique Shipment Reference per Shipment check box is
		selected and the Generate Plan (fmlbd0280m000) session is run, for
		example, for a particular period/freight order range and the same Reference is
		linked to multiple freight order lines (outbound lines) with different delivery
		times/dates, LN must
		still generate one single shipment per reference. This implies that the
		delivery time/date range on the order lines is extended so that both lines can
		be included in one and the same shipment. To create one single shipment, other
		criteria, if applicable, must also be met.    |   |