Resource Planning Parameters (tsspc0101m000)

Use this session to view and maintain planning parameters for the resource planning module.

This session contains:

  • A history list of parameter sets and their effective dates. The most recent parameter sets are at the end of the list.
  • The current parameter set, at the top of the list (without an effective date). To view historical sets, double-click one of the historical parameter sets. You can use the Print Service Parameters (tsmdm0400m000) session to print and compare the parameter sets.

To view or change the current parameters, double-click the set without an effective date that appears at the top of the list. The Resource Planning Parameters (tsspc0101m000) details session starts.

If you make changes and save the new parameter setting, Infor LN performs the following actions:

  • Adds the new set at the end of the history list.
  • Updates the current set (at the top of the list).
Note

By default, the Description field contains the date and time when the previous parameter setting was saved. To avoid confusion, if you change the parameters, change or delete the default Description text.

 

General
Introduction Date

The date and time from which the parameters are valid. The parameters are valid up to the effective date of the most recent parameter setting.

Description

The description of the parameter set. For example, the reason why the previous setting was changed.

Number Group for Group Planning Groups

The default number group for planning groups.

Number Group for Attribute Groups
Series for Group Sets

The default series defined for the group sets.

Note
  • This field is applicable only if the Field Service check box and the Depot Repair check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is applicable only if the Group Planning for Service Orders Implemented, Group Planning for Work Orders Implemented or Group Planning for Planned Activities Implemented check boxes are selected.
  • This field is applicable only if the Number Group for Group Planning Groups check box is selected.
Series for Reference Points

The default series defined for the reference points.

Series for Resources

The default series defined for the resources.

Distance Calculation Method

The method that must be used to calculate the distance between two locations.

Service Orders
Group Planning for Service Orders Implemented

If this check box is selected, the group planning functionality is implemented for service order activities.

Series for Groups

The default series defined for the service order groups.

Planned by Origin

If this check box is selected, the planning in Service is based on the service order.

Note
  • This check box is enabled only if the Group Planning for Service Orders Implemented check box is selected.
  • If this check box is selected, work load levelling is not executed.
Start Travelling on Start Time

If this check box is selected, the engineer must start the travel to the location, where the activity must be performed, at the Planned Start Time specified for a project. If this check box is cleared, the engineer must travel to the location in advance and start working on the activity at the specified Planned Start Time.

Note
  • This check box is displayed only if the Resource Planning and the Project (TP) check boxes are selected in the Implemented Software Components (tccom0100s000) session.
  • This field is enabled only if the Plan Method on the Projects tab is set to Planning Based on Route.
Start Travelling on Start Time

If this check box is selected, the engineer must start the travel to the location, where the activity must be performed, at the Planned Start Time specified for a service order. If this check box is cleared, the engineer must travel to the location in advance and start working on the activity at the specified Planned Start Time.

Note
  • This check box is displayed only if:
    • The Resource Planning check box is selected in the Implemented Software Components (tccom0100s000) session.
    • The Field Service check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is enabled only if the Plan Method on the Service Orders tab is set to Planning Based on Route.
Start Travelling on Start Time

If this check box is selected, the engineer must start travelling to the location where the activity must be performed, at the Planned Start Time specified for a planned activity. If this check box is cleared, the engineer must travel to the location in advance and start working on the activity at the specified Planned Start Time.

Note
  • This check box is displayed only if:
    • The Resource Planning check box is selected in the Implemented Software Components (tccom0100s000) session.
    • The Preventive Maintenance check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is enabled only if the Plan Method on the Planned Activities tab is set to Planning Based on Route.
Workload Leveling Method

The method to level the workload for group planning.

Note
  • This field is applicable only if the Field Service check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is applicable only if the Group Planning for Service Orders Implemented check box for the service order is selected.
  • This field is enabled only if the Planned by Origin check box is cleared on the Service Orders tab.
Plan Method

The method to plan the service order activities.

Note
  • This field is set to Planning Based on Time if the value for the Workload Leveling Method for the service order is set to Scheduling.
  • This field is set to Planning Based on Route if the value for the Workload Leveling Method for the service order is set to Geographically.

Allowed values

Plan Method

Sort Method

The sorting method for service order activities in an activity set.

Allowed values

Sort Method

Note

This field is enabled only if the Planned by Origin check box is cleared on the Service Orders tab.

Time Period

The time period format used while planning the activities.

Allowed values

Time Period

Note

This field is enabled only if the Planned by Origin check box is cleared on the Service Orders tab.

Material Availability Date

The date LN refers to, for the material availability check in group planning, for the service orders.

Note
  • This field is visible only if the Field Service check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is enabled only if the Respect Material Availability Date check box is selected on the Service Orders tab.
  • By default this field is set to ATP Date, if the Respect Material Availability Date check box for service orders is selected. However, you can modify this value.
  • This field is enabled only if the Planned by Origin check box is cleared on the Service Orders tab.
Respect Earliest Start Time

If this check box is selected, LN considers the earliest start time to plan the service order activity.

Note
  • For a service order activity, the planned start time must not be planned after the earliest start time.
  • This field is enabled only if the Planned by Origin check box is cleared on the Service Orders tab.
Respect Latest Finish Time

If this check box is selected, LN considers the latest finish time to plan the service order activity. The Planned Finish Time cannot be planned after the Latest Finish Time.

Note
  • LN re-plans the route for the activity.
  • This field is enabled only if the Planned by Origin check box is cleared on the Service Orders tab.
Respect Material Availability Date

If this check box is selected, LN considers the Material Availability Date to schedule the service orders, using group planning.

Note
  • This field is visible only if the Field Service check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is enabled only if the Group Planning for Service Orders Implemented check box is selected on the Service Orders tab.
  • This field is enabled only if the Planned by Origin check box is cleared on the Service Orders tab.
Propagate Firm Planned Down

If this check box is selected, and the Firm Planned setting is modified at the header level (or set level), the change is applicable to the activity set level (activity level). By default, this check box is selected.

Note

By default, this check box is selected and cannot be modified, if the Planned by Origin check box is selected on the Service Orders tab.

Propagate Frozen Down

If this check box is selected, and the Frozen setting is modified at the header level (or set level), the change is applicable to the activity set level (activity level). By default, this check box is selected.

Automatically Update Group Planning

If this check box is selected, group planning functionality is updated automatically.

Number of Iterations

The number of iterations to be performed by the territory planning engine for the service orders. A maximum of 10 iterations can be performed. The default value is five.

Note
  • This field is applicable only if the Field Service check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is applicable only if the Group Planning for Service Orders Implemented check box for the service order is selected.
  • This field is enabled only if Workload Leveling Method for the service order is set to Geographically.
  • This field is enabled only if the Planned by Origin check box is cleared on the Service Orders tab.
Relative Weight of Travel for Service Orders

The factor that determines the required travel duration of the service activities in a group. The value indicates the significance of the travel time to level the workload. A high factor has a higher impact on the required travel duration.

Note
  • The default value is three.
  • This field is applicable only if the Field Service check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is applicable only if the Group Planning for Service Orders Implemented check box for the service order is selected.
  • This field is not applicable if the value for the Workload Leveling Method field for the service order field is set to Scheduling.
  • This factor is used by the territory planning engine to estimate travel (number of kilometers).
  • This field is enabled only if the Planned by Origin check box is cleared on the Service Orders tab.
Minimize Slack

If this check box is selected, the slack periods must be minimized. When workload leveling is implemented, Infor LN minimizes the slack of the activities (for engineers) that are moved from one group to another within a group set.

Note
  • This field is applicable only if the Group Planning for Service Orders Implemented check box for the service order is selected.
  • This field is applicable only if the value for the Workload Leveling Method field for the service order is set to Scheduling.
  • This field is applicable only if the Respect Earliest Start Time field is set to Scheduling.
  • This field is enabled only if the Planned by Origin check box is cleared on the Service Orders tab.
Start Address of Route

The start location of the route.

Note

This field is enabled only if:

  • The Planned by Origin check box is cleared on the Service Orders tab.
  • The Plan Method on the Service Orders tab is set to Planning Based on Route.
Average Travel Speed

The average travel speed to calculate travel time when planning a route.

Note

This field is enabled only if the Planned by Origin check box is cleared on the Service Orders tab.

Unit

The unit in which the average travel speed is expressed.

Travel Offset Time

The travel offset time to calculate travel time when planning a route.

Note

This field is enabled only if the Planned by Origin check box is cleared on the Service Orders tab.

Unit

The unit in which the travel offset time is expressed.

Group Planning Activity Set Sequence

The step size of the sequence in activity sets for service order activities.

Group Planning Activity Sequence

The step size of the sequence in activities for service order activities.

Based on Attribute Values

If this check box is selected, Infor LN allocates resources based on attribute values for service orders.

Based on Skills

If this check box is selected, Infor LN allocates resources based on skills for service orders.

Automatically if only one found

If this check box is selected, Infor LN selects the Allocate Resource to Planning Group check box when only one resource is proposed.

Proposed Priority

The priority sequence for resource allocation.

Check Availability

If this check box is selected, Infor LN checks the availability of the resources for service orders.

Minimum Availability Percentage

The minimum availability percentage of the resource to be allocated for the group planning.

Plan Activities in Resource Calendar

If this check box is selected,:

  • activity status changes to Not Planned after allocation of resources (planning is required before releasing groups)
  • calendar of activities is updated with the calendar of the allocated resource (processing time required)

If this check box is cleared,:

  • activity status remains Planned after resource allocation
  • calendar of activities remains the original customer/installation calendar
  • performance is improved during allocation resources because updating of activities is not allowed
Note
  • During resource allocation, Infor LN defaults this value in the Used for Planning check box in the Group - Resources (tsspc3102m000) session.
  • This field is enabled only if the Planned by Origin check box is cleared on the Service Orders tab.
Work Orders
Group Planning for Work Orders Implemented

If this check box is selected, the group planning functionality is implemented for work order activities.

Series for Groups

The default series defined for the work order groups.

Planned by Origin

If this check box is selected, the planning in Service is based on the work order.

Note
  • This check box is enabled only if the Group Planning for Work Orders Implemented check box is selected.
  • If this check box is selected, work load levelling is not executed.
Sort Method

The sorting method for work order activities in an activity set.

Allowed values

Sort Method

Note

This field is enabled only if the Planned by Origin check box is cleared on the Work Orders tab.

Time Period

The time period format used while planning the activities.

Allowed values

Time Period

Note

This field is enabled only if the Planned by Origin check box is cleared on the Work Orders tab.

Material Availability Date

The date LN refers to, for the material availability check in group planning, for the work orders.

Note
  • This field is visible only if the Depot Repair check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is enabled only if the Respect Material Availability Date check box is selected on the Work Orders tab.
  • By default this field is set to ATP Date, if the Respect Material Availability Date check box for work orders is selected. However, you can modify this value.
  • This field is enabled only if the Planned by Origin check box is cleared on the Work Orders tab.
Respect Earliest Start Time

If this check box is selected, Infor LN considers the earliest start time to plan the work order activity.

Note
  • For a work order activity, the planned start time must not be planned after the earliest start time.
  • This field is enabled only if the Planned by Origin check box is cleared on the Work Orders tab.
Respect Latest Finish Time

If this check box is selected, Infor LN considers the latest finish time to plan the work order activity. The planned finish time cannot be planned after the latest finish time.

Note

This field is enabled only if the Planned by Origin check box is cleared on the Work Orders tab.

Respect Material Availability Date

If this check box is selected, LN considers the Material Availability Date to schedule the work orders, using group planning.

Note
  • This field is visible only if the Depot Repair check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is enabled only if the Group Planning for Work Orders Implemented check box is selected on the Work Orders tab.
  • This field is enabled only if the Planned by Origin check box is cleared on the Work Orders tab.
Propagate Firm Planned Down

If this check box is selected, and the Firm Planned setting is modified at the header level (or set level), the change is applicable to the activity set level (activity level). By default, this check box is selected.

Note

By default, this check box is selected and cannot be modified, if the Planned by Origin check box is selected on the Work Orders tab.

Propagate Frozen Down

If this check box is selected, and the Frozen setting is modified at the header level (or set level), the change is applicable to the activity set level (activity level). By default, this check box is selected.

Automatically Update Group Planning

If this check box is selected, group planning functionality is updated automatically.

Minimize Slack

If this check box is selected, the slack periods must be minimized. When workload leveling is implemented, Infor LN minimizes the slack of the activities (for engineers) that are moved from one group to another within a group set.

Note
  • This field is applicable only if the Group Planning for Work Orders Implemented check box for the work order is selected.
  • This field is enabled only if the Respect Earliest Start Time field is selected.
  • This field is enabled only if the Planned by Origin check box is cleared on the Work Orders tab.
Group Planning Activity Set Sequence

The step size of the sequence in activity sets for work order activities.

Group Planning Activity Sequence

The step size of the sequence in activities for work order activities.

Based on Attribute Values

If this check box is selected, Infor LN allocates resources based on attribute values for work orders.

Based on Skills

If this check box is selected, Infor LN allocates resources based on skills for work orders.

Automatically if only one found

If this check box is selected, Infor LN selects the Allocate Resource to Planning Group check box when only one resource is proposed.

Automatically highest priority

If this check box is selected, Infor LN selects the Allocate Resource to Planning Group check box for the resource with the highest priority.

Check Availability

If this check box is selected, Infor LN checks the availability of the resources for work orders.

Minimum Availability Percentage

The minimum availability percentage of the resource to be allocated for the group planning.

Plan Activities in Resource Calendar

If this check box is selected,:

  • activity status changes to Not Planned after allocation of resources (planning is required before releasing groups)
  • calendar of activities is updated with the calendar of the allocated resource (processing time required)

If this check box is cleared,:

  • activity status remains Planned after resource allocation
  • calendar of activities remains the original customer/installation calendar
  • performance is improved during allocation resources because updating of activities is not allowed
Note
  • During resource allocation, Infor LN defaults this value in the Used for Planning check box in the Group - Resources (tsspc3102m000) session
  • This field is enabled only if the Planned by Origin check box is cleared on the Work Orders tab.
Proposed Priority

The priority sequence for resource allocation.

Planned Activities
Group Planning for Planned Activities Implemented

If this check box is selected, the group planning functionality is implemented for planned activities.

Series for Groups

The default series defined for the planned activities groups.

Planned by Origin

If this check box is selected, the planning in Service is based on the planned activities.

Note
  • This check box is enabled only if the Group Planning for Planned Activities Implemented check box is selected.
  • If this check box is selected, work load levelling is not executed.
Workload Leveling Method

The method to level the workload for group planning.

Note
  • This field is applicable only if the Field Service check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is applicable only if the Group Planning for Planned Activities Implemented check box for the planned activity is selected.
  • This field is enabled only if the Planned by Origin check box is cleared on the Planned Activities tab.
Plan Method

The method to plan the planned activities.

Note
  • This field is set to Planning Based on Time if the value for the Workload Leveling Method for the planned activity is set to Scheduling.
  • The value in this field is set to Planning Based on Route if the value for the Workload Leveling Method for the planned activity is set to Geographically.
  • This field is enabled only if the Planned by Origin check box is cleared on the Planned Activities tab.

Allowed values

Plan Method

Sort Method

The sorting method for planned activities in an activity set.

Allowed values

Sort Method

Note

This field is enabled only if the Planned by Origin check box is cleared on the Planned Activities tab.

Time Period

The time period format used while planning the activities.

Allowed values

Time Period

Note

This field is enabled only if the Planned by Origin check box is cleared on the Planned Activities tab.

Respect Earliest Start Time

If this check box is selected, Infor LN considers the earliest start time to plan the planned activities.

Note
  • For a planned activity, the planned start time must not be planned after the earliest start time.
  • This field is enabled only if the Planned by Origin check box is cleared on the Planned Activities tab.

Respect Latest Finish Time

If this check box is selected, Infor LN considers the latest finish time to plan the planned activities. The Planned Finish Time cannot be planned after the Latest Finish Time. The planned activity is not planned.

Note
  • Infor LN re-plans the route for the activity.
  • This field is enabled only if the Planned by Origin check box is cleared on the Planned Activities tab.
Propagate Firm Planned Down

If this check box is selected, and the Firm Planned setting is modified at the header level (or set level), the change is applicable to the activity set level (activity level). By default, this check box is selected.

Note

By default, this check box is selected and cannot be modified, if the Planned by Origin check box is selected on the Planned Activities tab.

Propagate Frozen Down

If this check box is selected, and the Frozen setting is modified at the header level (or set level), the change is applicable to the activity set level (activity level). By default, this check box is selected.

Automatically Update Group Planning

If this check box is selected, group planning functionality is updated automatically.

Number of Iterations

The number of iterations to be performed by the territory planning engine for the planned activities. A maximum of 10 iterations can be performed. The default value is five.

Note
  • This field is applicable only if the Field Service check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is applicable only if the Group Planning for Planned Activities Implemented check box for the planned activities is selected.
  • This field is enabled only if Workload Leveling Method for the planned activity is set to Geographically.
  • This field is enabled only if the Planned by Origin check box is cleared on the Planned Activities tab.
Relative Weight of Travel for Planned Activities

The factor that determines the required travel duration of the service activities in a group. The value indicates the significance of the travel time to level the workload. A high factor has a higher impact on the required travel duration.

Note
  • The default value is three.
  • This field is applicable only if the Field Service check box and the Depot Repair check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is applicable only if the Group Planning for Planned Activities Implemented check box for planned activity is selected.
  • This field is not applicable if the value for the Workload Leveling Method field for the planned activity is set to Scheduling.
  • This factor is used by the territory planning engine to estimate travel (number of kilometers).
  • This field is enabled only if the Planned by Origin check box is cleared on the Planned Activities tab.
Minimize Slack

If this check box is selected, the slack periods must be minimized. When workload leveling is implemented, Infor LN minimized the slack for the activities which are moved from one group to another within a group set.

Note
  • This field is applicable only if the Group Planning for Planned Activities Implemented check box for the planned activity is selected.
  • This field is not applicable if the value for the Workload Leveling Method field for the planned activity field is set to Scheduling.
  • This field is applicable only if the Respect Earliest Start Time check box is selected.
  • This field is enabled only if the Planned by Origin check box is cleared on the Planned Activities tab.
Start Address of Route

The start location of the route.

Note

This field is enabled only if:

  • The Planned by Origin check box is cleared on the Planned Activities tab.
  • The Plan Method on the Planned Activities tab is set to Planning Based on Route.
Average Travel Speed

The average travel speed to calculate travel time when planning a route.

Note

This field is enabled only if the Planned by Origin check box is cleared on the Planned Activities tab.

Travel Offset Time

The travel offset time to calculate travel time when planning a route.

Note

This field is enabled only if the Planned by Origin check box is cleared on the Planned Activities tab.

Group Planning Activity Set Sequence

The step size of the sequence in activity sets for planned activities.

Group Planning Activity Sequence

The step size of the sequence in activities for planned activities.

Based on Attribute Values

If this check box is selected, Infor LN allocates resources based on attribute values for planned activities.

Based on Skills

If this check box is selected, Infor LN allocates resources based on skills for planned activities.

Automatically if only one found

If this check box is selected, Infor LN selects the Allocate Resource to Planning Group check box when only one resource is proposed.

Automatically highest priority

If this check box is selected, Infor LN selects the Allocate Resource to Planning Group check box for the resource with the highest priority.

Check Availability

If this check box is selected, Infor LN checks the availability of the resources for planned activities.

Minimum Availability Percentage

The minimum availability percentage of the resource to be allocated for the group planning.

Plan Activities in Resource Calendar

If this check box is selected,:

  • activity status changes to Not Planned after allocation of resources (planning is required before releasing groups)
  • calendar of activities is updated with the calendar of the allocated resource (processing time required)

If this check box is cleared,:

  • activity status remains Planned after resource allocation
  • calendar of activities remains the original customer/installation calendar
  • performance is improved during allocation resources because updating of activities is not allowed
Note
  • During resource allocation, Infor LN defaults this value in the Used for Planning check box in the Group - Resources (tsspc3102m000) session
  • This field is enabled only if the Planned by Origin check box is cleared on the Planned Activities tab.
Proposed Priority

The priority sequence for resource allocation.

Projects
Group Planning for Projects Implemented

If this check box is selected, the group planning functionality is implemented for projects.

Series for Groups

The default series defined for the project groups.

Planned by Origin (Projects)

If this check box is selected, the planning in Service is based on the project.

Note
  • This check box is enabled only if the Group Planning for Projects Implemented check box is selected.
  • If this check box is selected, work load levelling is not executed.
Workload Leveling Method

The method to level the workload for group planning.

Note
  • This field is applicable only if the Group Planning for Projects Implemented check box for the project is selected.
  • This field is enabled only if the Planned by Origin check box is cleared on the Projects tab.
Plan Method

The method to plan the project activities.

Note
  • This field is set to Planning Based on Time if the value for the Workload Leveling Method for the project activity is set to Scheduling.
  • The value in this field is set to Planning Based on Route if the value for the Workload Leveling Method for the project activity is set to Geographically.
  • This field is enabled only if the Planned by Origin check box is cleared on the Projects tab.

Allowed values

Plan Method

Sort Method

The sorting method for project activities in an activity set.

Allowed values

Sort Method

Note

This field is enabled only if the Planned by Origin check box is cleared on the Projects tab.

Time Period

The time period format used while planning the activities.

Allowed values

Time Period

Note

This field is enabled only if the Planned by Origin check box is cleared on the Projects tab.

Respect Earliest Start Time

If this check box is selected, Infor LN considers the earliest start time to plan the project activities.

Note
  • For a project activity, the planned start time must not be planned after the earliest start time.
  • This field is enabled only if the Planned by Origin check box is cleared on the Projects tab.
Respect Latest Finish Time

If this check box is selected, Infor LN considers the latest finish time to plan the project activities. The planned finish time cannot be planned after the latest finish time.

Note
  • Infor LN re-plans the route for the activity.
  • This field is enabled only if the Planned by Origin check box is cleared on the Projects tab.
Note

LN re-plans the route for the activity.

Propagate Firm Planned Down

If this check box is selected, and the Firm Planned setting is modified at the header level (or set level), the change is applicable to the activity set level (activity level). By default, this check box is selected.

Note

By default, this check box is selected and cannot be modified, if the Planned by Origin check box is selected on the Projects tab.

Propagate Frozen Down

If this check box is selected, and the Frozen setting is modified at the header level (or set level), the change is applicable to the activity set level (activity level). By default, this check box is selected.

Automatically Update Group Planning

If this check box is selected, group planning functionality is updated automatically.

Number of Iterations

The number of iterations to be performed by the territory planning engine for the planned activities. A maximum of 10 iterations can be performed. The default value is five.

Note
  • This field is applicable only if the Group Planning for Projects Implemented check box for the projects is selected.
  • This field is enabled only if Workload Leveling Method field for the projects is set to Geographically.
  • This field is enabled only if the Planned by Origin check box is cleared on the Projects tab.
Relative Weight of Travel for Project

The factor that determines the required travel duration of the service activities in a group. The value indicates the significance of the travel time to level the workload. A high factor has a higher impact on the required travel duration.

Note
  • The default value is three.
  • This field is applicable only if the Field Service check box and the Depot Repair check box is selected in the General Service Parameters (tsmdm0100m000) session.
  • This field is applicable only if the Group Planning for Projects Implemented check box for projects is selected.
  • This field is not applicable if the value for the Workload Leveling Method field for the projects is set to Scheduling.
  • This factor is used by the territory planning engine to estimate travel (number of kilometers).
  • This field is enabled only if the Planned by Origin check box is cleared on the Projects tab.
Minimize Slack

If this check box is selected, the slack periods must be minimized. When workload leveling is implemented, Infor LN minimized the slack for the activities which are moved from one group to another within a group set.

Note
  • This field is applicable only if the Group Planning for Projects Implemented check box for the project is selected.
  • This field is not applicable if the value for the Workload Leveling Method field for the projects field is set to Scheduling.
  • This field is applicable only if the Respect Earliest Start Time check box is selected.
  • This field is enabled only if the Planned by Origin check box is cleared on the Projects tab.
Start Address of Route

The start location of the route.

Note

This field is enabled only if:

  • The Planned by Origin check box is cleared on the Projects tab.
  • The Plan Method on the Projects tab is set to Planning Based on Route.
Average Travel Speed

The average travel speed to calculate travel time when planning a route.

Note

This field is enabled only if the Planned by Origin check box is cleared on the Projects tab.

Travel Offset Time

The travel offset time to calculate travel time when planning a route.

Note

This field is enabled only if the Planned by Origin check box is cleared on the Projects tab.

Group Planning Activity Set Sequence

The step size of the sequence in activity sets for projects.

Group Planning Activity Sequence

The step size of the sequence in activities for projects.

Based on Attribute Values

If this check box is selected, Infor LN allocates resources based on attribute values for projects.

Based on Skills

If this check box is selected, Infor LN allocates resources based on skills for projects.

Automatically if only one found

If this check box is selected, Infor LN selects the Allocate Resource to Planning Group check box when only one resource is proposed.

Automatically highest priority

If this check box is selected, Infor LN selects the Allocate Resource to Planning Group check box for the resource with the highest priority.

Check Availability

If this check box is selected, Infor LN checks the availability of the resources for projects.

Minimum Availability Percentage

The minimum availability percentage of the resource to be allocated for the group planning.

Plan Activities in Resource Calendar

If this check box is selected,:

  • activity status changes to Not Planned after allocation of resources (planning is required before releasing groups)
  • calendar of activities is updated with the calendar of the allocated resource (processing time required)

If this check box is cleared,:

  • activity status remains Planned after resource allocation
  • calendar of activities remains the original customer/installation calendar
  • performance is improved during allocation resources because updating of activities is not allowed
Note

This field is enabled only if the Planned by Origin check box is cleared on the Projects tab.

Automatically highest priority

If this check box is selected, Infor LN selects the Allocate Resource to Planning Group check box for the resource with the highest priority.

Quality
Group Planning for Non-Conformance Implemented

If this check box is selected, the group planning functionality is implemented for Non-Conformance Report related activities.

Group Planning for Corrective Action Plan Implemented

If this check box is selected, the group planning functionality is implemented for Corrective Action Plan related activities.

Series for Groups

The default series defined for the quality groups.

Planned by Origin (Non-Conformance Report)

If this check box is selected, the planning in Service is based on the non-conformance reports.

Note
  • This check box is enabled only if the Group Planning for Non-Conformance Implemented check box is selected.
  • If this check box and the Planned by Origin check box for the corrective action plan are selected, work load levelling is not executed.
Planned by Origin (Corrective Action Plan)

If this check box is selected, the planning in Service is based on the corrective action plans.

Note
  • This check box is enabled only if the Group Planning for Corrective Action Plan Implemented check box is selected.
  • If this check box and the Planned by Origin check box for the non-conformance are selected, work load levelling is not executed.
Sort Method

The sorting method for quality activities in an activity set.

Allowed values

Sort Method

Note

This field is enabled only if the Planned by Origin check box for the non-conformance and the corrective action plan is cleared.

Time Period

The time period format used while planning the activities.

Allowed values

Time Period

Note

This field is enabled only if the Planned by Origin check box for the non-conformance and the corrective action plan is cleared.

Propagate Firm Planned Down

If this check box is selected, and the Firm Planned setting is modified at the header level (or set level), the change is applicable to the activity set level (activity level). By default, this check box is selected.

Note

By default, this check box is selected and cannot be modified, if the Planned by Origin check box is selected for the non-conformance and the corrective action plan on the Quality tab.

Propagate Frozen Down

If this check box is selected, and the Frozen setting is modified at the header level (or set level), the change is applicable to the activity set level (activity level). By default, this check box is selected.

Automatically Update Group Planning

If this check box is selected, group planning functionality is updated automatically.

Minimize Slack

If this check box is selected, the slack periods must be minimized. When workload leveling is implemented, Infor LN minimized the slack for the activities which are moved from one group to another within a group set.

Note
  • This field is applicable only if the Group Planning for Non-Conformance Implemented or the Group Planning for Corrective Action Plan Implemented is selected.
  • This field is enabled only if the Planned by Origin check box for the non-conformance and the corrective action plan is cleared.
Group Planning Activity Set Sequence

The step size of the sequence in activity sets for quality.

Group Planning Activity Sequence

The step size of the sequence in activities for quality.

Based on Attribute Values

If this check box is selected, Infor LN allocates resources based on attribute values for quality related activities.

Based on Skills

If this check box is selected, Infor LN allocates resources based on skills for quality related activities.

Automatically if only one found

If this check box is selected, Infor LN selects the Allocate Resource to Planning Group check box when only one resource is proposed.

Automatically highest priority

If this check box is selected, Infor LN selects the Allocate Resource to Planning Group check box for the resource with the highest priority.

Check Availability

If this check box is selected, Infor LN checks the availability of the resources for quality related activities.

Minimum Availability Percentage

The minimum availability percentage of the resource to be allocated for the group planning.

Note

This field is applicable if the Check Availability check box is selected.

Plan Activities in Resource Calendar

If this check box is selected,:

  • activity status changes to Not Planned after allocation of resources (planning is required before releasing groups)
  • calendar of activities is updated with the calendar of the allocated resource (processing time required)

If this check box is cleared,:

  • activity status remains Planned after resource allocation
  • calendar of activities remains the original customer/installation calendar
  • performance is improved during allocation resources because updating of activities is not allowed
Proposed Resource Priority for Quality

The priority sequence for resource allocation.

Manufacturing
Group Planning for Job Shop Orders Implemented

If this check box is selected, the group planning functionality is implemented for Job Shop Order related activities.

Group Planning for Projects (PCS) Implemented

If this check box is selected, the group planning functionality is implemented for Projects (PCS) related activities.

Series for Groups

The default series defined for the manufacturing groups.

Planned by Origin

If this check box is selected, the planning in Service is based on the job shop orders.

Note
  • This check box is enabled only if the Group Planning for Job Shop Orders Implemented check box is selected.
  • If this check box is selected, work load levelling is not executed.
Planned by Origin

If this check box is selected, the planning in Service is based on the project (PCS).

Note
  • This check box is enabled only if the Group Planning for Projects (PCS) Implemented check box is selected.
  • If this check box is selected, work load levelling is not executed.
Sort Method

The sorting method for manufacturing related activities in an activity set.

Allowed values

Sort Method

Note

This field is enabled only if the Planned by Origin check box is cleared for the job shop orders or the project (PCS) on the Manufacturing tab.

Time Period

The time period format used while planning the activities.

Allowed values

Time Period

Note

This field is enabled only if the Planned by Origin check box is cleared for the job shop orders or the project (PCS) on the Manufacturing tab.

Respect Earliest Start Time

If this check box is selected, LN considers the earliest start time to plan the manufacturing activity.

Note
  • For a manufacturing activity, the planned start time must not be planned after the earliest start time.
  • This field is enabled only if the Planned by Origin check box is cleared for the job shop orders or the project (PCS) on the Manufacturing tab.
Respect Latest Finish Time

If this check box is selected, LN considers the latest finish time to plan the manufacturing activity. The Planned Finish Time cannot be planned after the Latest Finish Time.

Note
  • LN re-plans the route for the activity.
  • This field is enabled only if the Planned by Origin check box is cleared for the job shop orders or the project (PCS) on the Manufacturing tab.
Propagate Firm Planned Down

If this check box is selected, and the Firm Planned setting is modified at the header level (or set level), the change is applicable to the activity set level (activity level). By default, this check box is selected.

Note

By default, this check box is selected and cannot be modified, if the Planned by Origin check box is selected for the job shop orders and the project (PCS) on the Manufacturing tab.

Propagate Frozen Down

If this check box is selected, and the Frozen setting is modified at the header level (or set level), the change is applicable to the activity set level (activity level). By default, this check box is selected.

Automatically Update Group Planning

If this check box is selected, group planning functionality is updated automatically.

Minimize Slack

If this check box is selected, the slack periods must be minimized. When workload leveling is implemented, Infor LN minimizes the slack of the activities (for engineers) that are moved from one group to another within a group set.

Note
  • This field is applicable only if the Group Planning for Job Shop Orders Implemented or the Group Planning for Projects (PCS) Implemented check box is selected.
  • This field is enabled only if the Planned by Origin check box is cleared for the job shop orders or the project (PCS) on the Manufacturing tab.
Group Planning Activity Set Sequence

The step size of the sequence in activity sets for manufacturing activities.

Group Planning Activity Sequence

The step size of the sequence in activities for manufacturing activities.

Based on Attribute Values

If this check box is selected, Infor LN allocates resources based on attribute values for the manufacturing activities.

Based on Skills

If this check box is selected, Infor LN allocates resources based on skills for the manufacturing activities.

Automatically if only one found

If this check box is selected, Infor LN selects the Allocate Resource to Planning Group check box when only one resource is proposed.

Automatically highest priority

If this check box is selected, Infor LN selects the Allocate Resource to Planning Group check box for the resource with the highest priority.

Check Availability

If this check box is selected, Infor LN checks the availability of the resources for the manufacturing activities.

Minimum Availability Percentage

The minimum availability percentage of the resource to be allocated for the group planning.

Plan Activities in Resource Calendar

If this check box is selected,:

  • activity status changes to Not Planned after allocation of resources (planning is required before releasing groups)
  • calendar of activities is updated with the calendar of the allocated resource (processing time required)

If this check box is cleared,:

  • activity status remains Planned after resource allocation
  • calendar of activities remains the original customer/installation calendar
  • performance is improved during allocation resources because updating of activities is not allowed
Note
  • During resource allocation, Infor LN defaults this value in the Used for Planning check box in the Group - Resources (tsspc3102m000) session.
  • This field is enabled only if the Planned by Origin check box is cleared for the job shop orders or the project (PCS) on the Manufacturing tab.
Proposed Priority

The priority sequence for resource allocation.