To use level typesIf the leading estimate type (LET) in the Structural Elements (tpest1120m000) session is Bottom Up, you can calculate estimate totals for Total and Detail level types. If the leading estimate type is Top Down for a structural element, you cannot apply level type aggregation, but you can use level types to check the consistency of top-down lines. Level types for a top-down estimate line are:
Top-down level types In the User Profile (tppdm0101s000) session, you can define the settings for a consistency check. You can also define if the check of the Verify Top-Down Estimate Consistency (tpest2220m000) session is performed for each field or each record. Using the Level field types entered in the Estimate Lines (tpest2100m000) session, the check is performed in this order:
Note The Cost Type - Detail lines amount check is only performed if you run the Verify Top-Down Estimate Consistency (tpest2220m000) session. Bottom-up level types A bottom-up line can only have two level types: Total and Detail. Enter and add the unit costs, in the Structural Elements (tpest1120m000) session you can determine which level type must be used in the bottom-up estimate. The values of the Cost Level and Sales Level fields determine the lines that are aggregated for cost or sales. The Launch field’s level type determines which estimate lines linked to the defined level type are launched to budgeting. If the level type is set to Total, all estimate lines of that level type are launched to the project budget. Leading estimate type (LET) calculations Click the Aggregate Totals in the Estimate Lines (tpest2100m000) session to calculate the structural elements’ total amount of the leading estimate type using the estimate lines. The amount is displayed in the various LET Total fields. If you use bottom-up estimating, the calculation also depends on the settings of the level type in the Structural Elements (tpest1120m000) session. For example, the LET of element 011 is top down and you have three top-down lines for 011 and two bottom-up lines. Consequently, only the top-down lines are used in the LET calculation. Total level type calculation In the Estimate Lines (tpest2100m000) session, the calculations of estimate lines totals are displayed. For example, the LET is EURO 60 million; the amount displayed is based on the setting of the view. When the setting of the view is TOP element, the value is displayed in the Top Down Total: EURO 60 million. The calculation of the Bottom Up structure differs. The structural elements amounts are added (011 + 023 + 022 = 5 + 15 + 1 = EURO 21 million) and the Cost Level field type is used to determine the selected amounts. For the bottom-up estimating, you can also calculate a total with the Detail level type. If Cost Level field type in the Structural Elements (tpest1120m000) session is set to Detail, the following result is displayed: 3 + 1 + 0 + 15 + 0,5 = EUR 19.5 million. If you view the bottom-up lines of 011, there is a difference in amount; the Total line amount is an approximate amount, whereas the Detail lines are accurate labor hours. If the Cost Level field type is Detail, the total for 011 is 3 million; based on the combination of 2.7 and 0.3 million that is set for 011. Detail level-type calculation for leading estimate type (LET):
You can use the LET total and the cost total to calculate and recalculate different estimates before you send a bid. The aim is to create a cost estimate. With the same estimate, you can present a sales estimate with the required level of detail.
| |||