Materials (tirpt2120m000)

Use this session to import the list of materials from a bill of material (BOM).

 

Item

The item being built.

Note

You can only specify physical items.

Production Model

A predefined configuration that specifies the production method, list of materials, time and capacity required and reporting method.

A production model contains the following:

  • Production process
  • Time and capacity required
  • Production process reporting
  • Materials supply process
  • Item inspection method
  • Required tools

If the Multi-Product Production check box on a production model for repetitive manufacturing is selected, a list of products is added to the production model that specifies which items are produced.

Note
  • Production models are revision controlled. A new revision is generated for every change to the existing configuration.
  • The order system must be Planned.
  • Project Control is disabled.
Production Model Revision

The ID of the product model revision.

Sequence Number

The unique number given to assignments that are defined for the same production model revision.

Material

The material or subassembly used in the manufacture of the product.

Note

You can only specify Purchased or Manufactured items.

Quantity

The quantity of the repetitive item.

Scrap (%)

The percentage of material that will be lost during production.

Point of Usage

The shop floor warehouse from which the materials are shipped linked to the work cell where the materials are used.

Note

For direct material supply, this field should be left empty.

Supply System

The supply system specified for the material in the Item Data by Warehouse (whwmd2510m000) session, and the assigned Point of Usage.

Supply Warehouse

The warehouse supplying the Point of Usage.

The warehouse is determined based on the Default Warehouse field in the Items - Planning Defaults (cprpd1110m000) session. If no warehouse is specified in the Items - Planning Defaults (cprpd1110m000), the warehouse specified in the Warehouse field in the Item - Ordering (tcibd2100m000) session is used.

Supply Work Cell

The work cell supplying, defined in the Work Cell (tirpt0640m000) session.

Backflush

If this check box is selected, the schedule line materials are backflushed.

As-Built

If this check box is selected, the serial number or lot must be entered in the As-Built (timfc0610m000) session before the as-built is validated.