Generate (Project) Structure for Product Variant (tipcs2220m000)

Use this session to generate a product structure from a generic item, or to regenerate a product variant structure of an existing project.

Note

When a product structure is generated for a generic item, the Customized check box in the Items (tcibd0501m000) session of the generated item data will be selected.

If the With PCS check box in the Items (tcibd0501m000) session of the generated item is selected, the product structure is generated in a PCS project.

 

Regenerate Existing Product Variant

If this check box is selected, the existing product variant structure is deleted and a new product variant structure is generated. This action can update existing sales order lines and sales quotation lines.

If this check box is cleared, a new product variant structure is generated.

Item

An item produced on a customer specification for a specific project. A customized item can have a customized BOM and/or a customized routing and is normally not available as a standard item. A customized item can, however, be derived from a standard item or a generic item.

Related topics

Generic Item

An item that exists in multiple product variants. Before any manufacturing activities are performed on a generic item, the item must be configured to determine the desired product variant.

Example

Generic item: electric drill

Options:

  • 3 power sources (batteries, 12 V or 220 V)
  • 2 colors (blue, gray).

A total of 6 product variants can be produced with these options.

Product Variant

In this field you can select a product variant.

Project

A collection of manufacturing and purchasing actions that are performed for a particular customer order. A project is initiated to plan and coordinate the production of the to be manufactured items.

For a standard-to-order production, the project is only used to link the item with the customer order. A project can also include these:

  • Customized item data (BOMs and routings)
  • Project planning (activity planning)
Reference Date

The date on which the BOM and the routing operations are exploded when a customized product structure is generated.

Update Project Reference Date

If this check box is selected, the project's reference date is updated by the reference date in this session.

If this check box is cleared, the project's reference date is not updated by the reference date in this session.

Generation Method

This field allows you to specify the method used to generate the project structure.

Allowed values

You can select the following methods:

  • Engineer-to-Order
    LN generates a product structure for the item including customized items, customized BOMs and customized routings.
  • Standard-to-Order
    LN creates a PCS project for the item but no customized BOM and routing. The PCS project is mainly used for pegging purposes, for example, to track down the costs for the customized item.
Note

In case of a generic item, LN creates a PCS project, customized BOM, and customized routing for the generic part of the item structure. However, for (lower level) parts of the item structure with a production BOM, the items become customized, but no customized BOM and routing are generated.

Check Standard Item Inventory

If this check box is selected, the inventory level for the standard items is checked. If sufficient inventory of a standard item is available, no customized item is generated. If no inventory, or insufficient inventory is available, the customized item is generated.

Update Prices Quotation Lines

If this check box is selected, prices in existing quotation lines are updated.

Update Prices Sales Order Lines

If this check box is selected, prices in existing sales order lines are updated.

Print Warnings

If this check box is selected, any warnings during the execution of the session will be printed.