O.E.E. calculation

A method of calculating the overall effectiveness of a production environment, you can use to measure and optimize the efficiency of both individual machines and whole plants.

You can measure, compare and contrast the overall effectiveness of individual or groups of identical machines performing a similar function.

Example

Three different schedules produce three different parts over an eight hour shift that includes two ten minute breaks and a five minute hand over period.

Shift Data
Schedule ASchedule BSchedule C
Part Number BuiltA123B456C789
Cycle10 seconds45 seconds70 seconds
Good Units Produced2240450229
Scrap Units Produced502511
Unplanned Downtime32 minutes18 minutes22 minutes
Scheduled Time480 minutes (8*60)480 minutes (8*60)480 minutes (8*60)
Planned Down Time25 minutes total25 minutes total25 minutes total

 

O.E.E.Schedule ASchedule BSchedule C
Net Available Time (NAT)455 minutes (480-25)455 minutes (480-25)455 minutes (480-25)
Net Operating Time (NOT)423 minutes
(455-32)
437 minutes
(455-18)
433 minutes
(455-22)
Ideal Operating Time (IOT)381.67 minutes
((2290 units*10 seconds)/60)
356.25 minutes
(475 units*45 seconds)/60)
280 minutes
(240 units*70 seconds)/60)
Lost Operating Time (LOT)8.33 minutes
((50 scrap units*10 seconds)/60)
18.75 minutes
((25 scrap units*45 seconds)/60)
12.83 minutes
((11 scrap units*70 seconds)/60)
Availability92.97%
(NOT/NAT)*100
96.04%
(NOT/NAT)*100
95.16%
(NOT/NAT)*100
Performance90.23%
(IOT/NOT)*100
81.52%
(IOT/NOT)*100
64.67%
(IOT/NOT)*100
Quality97.82%
((IOT-LOT)/IOT)*100
94.74%
((IOT-LOT)/IOT)*100
95.42%
((IOT-LOT)/IOT)*100
O.E.E.82.06%
Availability*Performance*Quality
74.17%
Availability*Performance*Quality
58.88%
Availability*Performance*Quality

 

Where multiple products, or shifts are involved, you must apply weighting factors to the calculated results to produce statistically valid results.

Availability
Schedule A423 minutes
Schedule B437 minutes
Schedule C433 minutes
Total Net Operating Time1293 minutes
Total Net Available Time1365 minutes
Weighted
1293/1365=94.73%

 

Performance
Schedule A381.67 minutes
Schedule B356.25 minutes
Schedule C280 minutes
Total Ideal Operating Time1017.92 minutes
Total Net Operating Time1293 minutes
Weighted
1017.92/1293=78.73%

 

Quality
Schedule A8.33 minutes
Schedule B18.75 minutes
Schedule C12.83 minutes
Total Lost Operating Time39.91 minutes
Total IOT1017.92 minutes
Weighted
39.91/978=96.08%

 

The weighted Overall Equipment Effectiveness is:

94.73*78.73*96.08=71.66%