Modeling the Shop FloorBefore production can take place, the shop floor of your factory has to be modeled. Within a site, the job shop production is organized in the following way:
To setup the shop floor you must:
Requirements for shop floor modeling:
Using the machine capacity group functionality, you can define a number of machine types per work center and their logistical and planning properties. You can use the Machine Capacity Groups (tirou4161m000) session to define and manage the groups for each work center.
| |||