The P-BOM is defined in the Production Bills of Material (timfc3100m000) session.
The P-BOM revision was generated from an existing production bill of material.
The P-BOM is generated from an engineering bill of material.
If the P-BOM is generated from an E-BOM, the Source Engineering Item and Source Engineering Revision fields are filled.
The P-BOM is generated from data imported from the PCF configurator.
The P-BOM is generated from data imported from Infor Configurator.
The P-BOM is generated from data imported from PLM.
The P-BOM was generated from a job shop bill of material.