The project ID.
Default value
This field is empty by default.
Generate Operation Rates (ticpr1251m000)Use this session to to generate new, date-effective operation rates from existing operation rates. You can generate the operation rates from the Operation Rates by Project (tipcs1150m000) and Operation Rates (ticpr1150m000) sessions. You can run this session for multiple selection options and ranges. Note
Project (PCS) The project ID. Default value This field is empty by default. Cost Calculation Code The selected cost calculation code range. Default value Standard cost calculation code from the Standard Cost Calculation Code field in the Standard Cost Calculation Parameters (ticpr0100m000) session. Operation Rate Code The selected operation rate code range. Default value The full range is selected, if no range is specified.
| |||