Job Shop Bill of Material (tibom3600m000)

Use this session to manage job shop bills of material per site.

This session displays data from:

  • Job Shop List of Materials (tibom3110m000)
Note

To use this session the Job Shop by Site parameter in the Multisite Concepts Activation (tcemm4600m000) session must be set to Active or In Preparation.

 

Site

The site ID.

Product

The product ID.

Model

The ID of the predefined configuration that specifies the production method, list of materials, time and capacity required and reporting method used to manufacture the product.

Revision

The JSBOM revision number.

Status

The status of the job shop bill of material.

Only JSBOMs with the status Approved can be used for manufacture.

Allowed values

  • New
  • Approved
  • Expired
BOM Quantity

The number of manufactured products to which a bill of materials (BOM) applies. The BOM quantity enables you to specify very small product quantities as BOM components.

Example

You need very small amounts of certain colors to mix one liter of a specific paint, Cotton White. Therefore, a BOM quantity of 1000 liter is defined. The component quantities for the paint can then be as follows:

Paint Cotton White, 1000 liter:
White999 liter
Yellow0.6 liter
Red0.2 liter
Blue0.2 liter

 

Routing

The routing ID.

Note

Only routings linked to the specified site can be selected.

Text

If this check box is selected, additional text is present.

Use for Planning

If this check box is selected, the selected JSBOM is used for planning.

Note

Per item and site, only one Job Shop bill of material can be used for planning.

Use for Costing

If this check box is selected, the selected JSBOM is used for costing.

Note

Only one JSBOM per product can be used for costing purposes.

Effective Date

The date the JSBOM revision becomes effective.

Expiry Date

The date the JSBOM revision expires.

Source

The PBOM ID from which the JSBOM revision was generated.

Source Revision

The PBOM revision from which the JSBOM revision was generated.

Created By

The employee responsible for generating the JSBOM.

Created On

The date the JSBOM was generated.

Approved By

The employee responsible for approving the JSBOM revision.

Approved On

The date the JSBOM revision was approved.

Expired By

The date the JSBOM revision was expired.

Expired On

The employee responsible for expiring the revision.