Specify the product range for which the production and job shop bills of material are generated.
Generate Production and Job Shop Bills of Material (tibom3200m400)Use this session to generate production and job shop bills of material based on the data from the Bill of Material (tibom1110m000) session. Note To use this session the Job Shop by Site parameter in the Implemented Software Components (tccom0100s000) session must be set to In Preparation.
From/To Product Specify the product range for which the production and job shop bills of material are generated. BOM Model Order Series The series to be used for the production and job shop bills of material. BOM Model Series by Site If this check box is selected, the series defined for each site in the Production Settings by Site (timfc0180m000) are used. If this check box is cleared, you must specify a series in the BOM Model Order Series field. Production Bill of Material If this check box is selected, production bills of material are created. Create Revision The available options to create revisions. Create From The date as from which revisions are created This date limit is the effective date of the first revision. This date is used to determine up to how far in the past revisions are to be created. The option specified in the Create Revisions field determines how the revisions are crated. Project Status up to and including The project status up to which customized items must be included. Default value Active Allowed values
Print Messages If this check box is selected, a report that lists the results and any errors occurring in during the process is printed. Simulation If this check box is selected, the process is run in simulation mode, that is, the data is not actually generated, but a preview of the results is generated Validate and Approve If this check box is selected, the bills of material (BOMs) are validated and BOMs with status Approved are created.
| |||