|   | Generate (Budget PCS) Structure for Sales Quotations (tdsls1201m100)Use this session to generate a budget structure or product structure for items on the sales quotation
		  line. The following check boxes determine whether a budget
			 structure and/or a product structure is generated for the items: - The Customizable and With PCS check boxes in the Items (tcibd0501m000) session.
 - The MakeCustomized check box in the Sales Quotation Lines (tdsls1501m000) session.
 - The Generate Budget Parts for Cost/Service Items check
			 box in the current session.
 - The Generate Budget Parts for all Quotations check box in
			 the current session.
 
 Note - When the sales quotation is converted to a sales order, you
			 must copy the budget to a project if the With PCS check box is selected for the item in the Items (tcibd0501m000) session. If the With PCS check box is cleared for a generic item, the generic item is converted to a newly
			 configured standard item,
			 instead of a customized item.
			 Configuring a generic item without a linked budget, makes the calculation of
			 budget costs redundant.
 - You can generate one budget structure for each sales
			 quotation or consolidate a range of sales quotations into a single budget
			 structure.
 - If you choose to create one budget structure for each
			 quotation, you can use the sales quotation number as the budget number.
 - When you generate the structure of a generic item without a
			 budget, the newly configured standard item has no budget code as a distinctive
			 feature. To make the item code distinctive, clear the Identifying Item Code in the Product Configuration Parameters (tipcf0100m000) session. As a result, LN adds a sequence number
			 to the item code of the generic item to generate new item codes for each
			 product variant. You can specify the exact position of this sequence number in
			 the Sequence Number of Item Code from Position and Sequence Number of Item Code to Position fields of the Product Configuration Parameters (tipcf0100m000) sessions. New item codes are
			 generated for the end item derived from the generic item, and for all materials
			 of the end item that have the Customizable check box selected.
 
 Customizing unit effective items To customize a unit effective item in the Generate (Budget PCS) Structure for Sales Quotations (tdsls1201m100) session, a full copy
		  method is used. This means that the complete bill of material as well as all
		  operations applicable to all effectivity units, are copied to the budget. In
		  addition, all exceptions linked to BOM lines and operations are copied. If you make changes to an effectivity unit in a budget, for
		  example, by changing the effectivity unit on the linked sales quotation, you
		  need not regenerate the budget, because all data related to the unit effective
		  item is already present. Note - Unit effective routings are not copied to the budget.
				Similar to routings that are not unit effective, either the default routing of
				the unit effective item, or a routing based on a fixed order quantity or
				economic order quantity is copied to the budget.
 - This functionality does not apply to generic items.
 
 Important! This session only processes sales quotation lines with the Created status.   Generation Method Select the method used to generate an item structure for sales
		  quotations. Engineer-to-Order  LN creates a customized item for the item you entered on the sales quotation line,
				as well as a customized BOM and a customized routing. As a result, if a child
				in a BOM has the Customizable check box selected in the Items (tcibd0501m000) session, a customized item is created for the child
				after which it is inserted in the parent's customized BOM. Standard-to-Order  LN only creates a customized item for the item on the sales quotation line (if the Customizable check box is selected for the item in the Items (tcibd0501m000) session). LN does not create a customized BOM or a
				customized routing at any level in the product structure. 
 Note The item structure for generic items with the Customizable check box cleared in the Items (tcibd0501m000) session is always based on the Engineer-to-Order generation method. As a result, LN creates a configured
			 standard item for the item on the sales quotation line with a customized BOM
			 and a customized routing. Budget Series The series used to generate the budget code. Calculation Group Select a calculation group to distinguish between quotation
		  line alternatives that use the same budget code. When a quotation line is
		  converted to a sales order line, only for the calculation group that contains
		  the selected alternative, the budget is transformed into a real project. Create One Budget per Quotation If this check box is selected, each sales quotation
		  creates a separate budget structure. All items in the sales quotation receive
		  the same code when the budget is generated. Equate Budget with Quotation If this check box is selected, the budget uses the same
		  number as the sales quotation. If this check box is cleared, you
		  must define Budget Series to generate a budget code. Check Standard Item Inventory  If this check box is selected, inventory is checked to
		  find out whether the customized end item is already available in inventory as a
		  standard item. If so, then no new customized end item is created. Note This check is only carried out for generic end items that
			 have the Customizable check box selected in the Items (tcibd0501m000) session. For generic end items with the Customizable check box cleared, no inventory check is
			 performed and a new customized item is always generated. Print to predefined Device Create Quotation Lines for Phantom If this check box is selected, sales quotation lines
		  for phantom items are replaced by sales quotation lines for
		  the components of that same phantom. Note The components' sales quotation price is calculated based
				on the following: - The price, discount, and quantity for the generic item that
				is originally entered on the sales quotation line.
 - The number of different components.
 - The order quantity for each component.
 
 The original price/discount of the parent (generic) item is
			 incorporated in the component's sales price. After calculation of a component's
			 sales price, the link with the original price is broken. Caution! After the sales price is calculated for the quotation lines
			 with the components, and you want to recalculate the price/discount for a
			 component in the Price and Discount Recalculation Parameters (tdpcg0240s000) session,
			 take into account that the product variant price is assigned to the line and
			 that LN does not use the
			 parent item's price and/or discount. As a result, it is your task to split and
			 calculate the new price for the different lines with the
			 components. Example | Item | Price
					 (Euro) | 
|---|
 | Product variant
					 GEN1 | 120 |  | Generic item
					 A | 90 |  | Component 1 | 30 |  | Component
					 2 | 30 |  | Component 3 | 30 |  
   - Generic item A and product variant GEN1 are entered on
				sales quotation line 10. Generic item A, which is linked to product variant
				GEN1, is defined as a phantom item. Because a discount of 30 Euro is entered on
				this sales quotation line, the price arrives at 90 Euro.
 - The product variant is configured with the features
				(components) 1, 2, and 3.
 - The Generate (Budget PCS) Structure for Sales Quotations (tdsls1201m100) session is run with the Create Quotation Lines for Phantom check box
				selected.
 - On sales quotation line 10, LN automatically replaces
				Generic item A with component 1 and adds quotation lines 20 and 30 for the
				components 2, and 3. 
If component 3 must be ordered twice, the prices on
					 the quotation lines are: - Quotation line 10: 30 Euro
 - Quotation line 20: 30 Euro
 - Quotation line 30: 15 Euro
 
  - If you decide to recalculate the price/discount for
				quotation line 20, LN comes up with the product variant price of 120 Euro. 
As a result, you must perform the
					 following: - Change the price for quotation line 10 from 30 to 40
					 Euro.
 - Change the price for quotation line 10 from 120 to 40
					 Euro.
 - Change the price for quotation line 10 from 15 to 20
					 Euro.
 
  
 Generate Budget Parts for Cost/Service Items Together with the Generate Budget Parts for all Quotations check box,
		  this check box determines whether purchased, manufactured, cost, or service
		  items that have the Customizable check box cleared in the Items (tcibd0501m000) session, can be linked to a budget as a budget
		  part. Setting 1 The Generate Budget Parts for Cost/Service Items and Generate Budget Parts for all Quotations check boxes
			 are both cleared. In this case, LN only takes into account the sales quotations
			 that contain at least one sales quotation line with the MakeCustomized check box selected for the item. For these quotations: - The cost and service items are not linked as budget
				parts.
 - The purchased and manufactured items are linked as budget
				parts.
 
 Setting 2 The Generate Budget Parts for Cost/Service Items is
			 selected, but the Generate Budget Parts for all Quotations check box is
			 cleared. In this case, LN only takes into account the sales quotations
			 that contain at least one sales quotation line with the MakeCustomized check box selected for the item. For these quotations: - The cost and service items are linked as budget
				parts.
 - The purchased and manufactured items are linked as budget
				parts.
 
 Setting 3 The Generate Budget Parts for Cost/Service Items is
			 cleared, but the Generate Budget Parts for all Quotations check box is
			 selected. In this case, LN takes into account all sales quotations and
			 not only the ones with the MakeCustomized check box selected for one of the
			 lines. For these quotations: - The cost and service items are not linked as budget
				parts.
 - The purchased and manufactured items are linked as budget
				parts.
 
 Setting 4 The Generate Budget Parts for Cost/Service Items and the Generate Budget Parts for all Quotations check boxes
			 are both selected. In this case, LN takes into all sales quotations and not only
			 the ones with the MakeCustomized check box selected for one of the
			 lines. For these quotations: - The cost and service items are linked as budget
				parts.
 - The purchased and manufactured items are linked as budget
				parts.
 
 Note - To prevent you from processing the same quotations and
				linking the same items as budget parts, in this session, LN does not take into
				account the sales quotation lines for which the MakeCustomized check box is cleared, but the Budget is filled in the Sales Quotation Lines (tdsls1501m000) session.
 - You can view and maintain budget parts in the Project Parts (tipcs2111m000) session.
 
 Generate Budget Parts for all Quotations Together with the Generate Budget Parts for Cost/Service Items check
		  box, this check box determines whether purchased, manufactured, cost, or
		  service items that have the Customizable check box cleared in the Items (tcibd0501m000) session, can be linked to a budget as budget
		  parts. Important! If you add, for example, a new sales quotation line to an
			 existing quotation for which a budget structure is already generated, you can
			 select this check box to indicate that the new item must also be linked to the
			 budget as a budget part. In addition, if the Create One Budget per Quotation check box is selected
			 in this session, the sales quotation's budget is used. If the Create One Budget per Quotation check box is cleared,
			 the budget part is linked to a new budget. Note - To prevent you from processing the same quotations and
				linking the same items as budget parts, in this session, LN does not take into
				account the sales quotation lines for which the MakeCustomized check box is cleared, but the Budget is filled in the Sales Quotation Lines (tdsls1501m000) session.
 - You can view and maintain budget parts in the Project Parts (tipcs2111m000) session.
 
      |   |