Purchase Order Planned Materials (tdpur4532m000)

Use this session to view the bill of material (BOM) which is copied to a specific purchase order line.

Note

You can copy a BOM to a purchase order line in the Purchase Order Lines (tdpur4101m000) session.

 

Order Line

The number identifying the purchase order.

Project

The code of the project for which the item is required.

Line
Item

The raw materials, subassemblies, finished products, and tools that can be purchased, stored, manufactured, and sold.

An item can also represent a set of items handled as one kit, or which exist in multiple product variants.

You can also define nonphysical items, which are not retained in inventory but can be used to post costs or to invoice services to customers. The examples of nonphysical items:

  • Cost items (for example, electricity)
  • Service items
  • Subcontracting services
  • List items (menus/options)
BOM Line

A reference number identifying a specific combination of manufactured and component items in a bill of material. The position number is subdivided by sequence numbers that are used to refer to usage of a component between particular dates.

Item

The item code of the BOM component.

Quantity

The net quantity of the component.

Quantity

The order unit in which the quantity is expressed.