| Activating Job Shop by Site for multisiteTo use the Job Shop by
Site functionality, the Job Shop by Site concept must be Active in
the Multisite Concepts Activation (tcemm4600m000) workbench session. If the concept is Active,
the bill of material (BOM) and routing for an item are managed on site
level. Before you can activate the Job Shop by Site concept, you must activate these concepts in the Multisite Concepts Activation (tcemm4600m000) workbench session: - Item Type Product
- Standard Cost by Enterprise Unit
- Planning Cluster Mandatory
- Sites
Step 1. Set parameter to In PreparationClick In Preparation on the Job Shop by Site tab of the Multisite Concepts Activation (tcemm4600m000) workbench session. The status changes from Inactive to In Preparation for each company of the current multicompany environment,
including the financial companies. In addition, various sessions become available in which you
must define and validate the master data that are required to use the Job Shop
by Site functionality. These sessions are accessed from the Multisite Concepts Activation (tcemm4600m000) workbench session. Step 2. Preparation and validationIn this step, you must set up various master data. This is
done for each individual logistic company or company of type Both in
your multicompany environment. This master data is not present in financial
companies. This setup includes the creation of Job Shop Bills of
Material and Job Shop Routings that replace the current Bills of Material and
the current Item routings. The setup is performed in the Job Shop by Site tab in the Multisite Concepts Activation (tcemm4600m000) workbench session. See Activating multisite concepts and The Multisite Concepts Activation (tcemm4600m000) workbench. In activation activities for which data is generated,
generate the data and validate the data as often as needed until no more errors
are listed in the report. The step titles in this list refer to the activation
activity options in the Multisite Concepts Activation (tcemm4600m000) workbench session. The sessions referred to
in each step are accessed from the Activation Activity (tcemm4610m000) session. Preliminary Validation Define BOM and Routing Parameters In the Job Shop Master Data Parameters (tirou0100m000) session, specify these company
settings: - BOM Model Number Group
- BOM Model Order Series
- Default Job Shop Routing
-
Optionally, adjust these settings: - Allow Multiple Job Shop BOMs per Item and Site
- Use Site-specific Reference Operations Only
- Approve Structures Automatically
Define BOM and Routing Settings -
In the Production Settings by Site (timfc0180m000) session, specify these settings by
site: - Operation Rate Currency
- Clear the Use Global Parameters check box and optionally, specify BOM series and
default job shop routings by site.
Validate the settings specified in steps 2 and 3 by
selecting the New Job Shop Settings check box in the Validate Master Data for Job Shop by Site (timfc0200m000) session. Validate the use of Subcontracting rate factors by
selecting the Subcontracting Rates check box in the Validate Master Data for Job Shop by Site (timfc0200m000) session.
Generate Reference Operations Generate New Operation Rates Autofill Generic Routing Generate Job Shop Routing Use the Generate Job Shop Routings (tirou4200m100) session to copy routings from the Item - Routings (tirou1101m000) session to the Job Shop Routings (tirou4100m000) session and the Standard Job Shop Routings (tirou4100m100) session. See Job Shop by Site activation - Converting sequences to revisions on the options to convert operation sequences to job
shop routing versions. Select the Job Shop Routings check box in the Validate Master Data for Job Shop by Site (timfc0200m000) session to check that
routings are copied successfully, and that the routing codes present on orders
and other objects match the generated routing codes. For orders without routing codes, a check is
performed whether routings have been generated that match the order quantities
and revision reference dates. See Validate Job Shop routings.
Generate Production and Job Shop BOM Use the Generate Production and Job Shop Bills of Material (tibom3200m400) session to copy bills of material (BOMs) from the Bill of Material (tibom1110m000) session to the Job Shop Bills of Material (tibom3100m000) and to the Production Bills of Material (timfc3100m000) session. BOM lines whose expiry dates lie before the date
specified in the Create From field of the Generate Production and Job Shop Bills of Material (tibom3200m400) session are not copied. Revision controlled items are copied to a Job Shop BOM
and a Production BOM. Non-revision controlled items must be copied to a Job
Shop BOM. Optionally, they can be copied to a Production BOM. In the Generate Production and Job Shop Bills of Material (tibom3200m400) session, a check verifies that values are specified in
the BOM Model Number Group and BOM Model Order Series fields in the Job Shop Master Data Parameters (tirou0100m000) session and in the Production Settings by Site (timfc0180m000) session for each site. Define Machine Types in PCS Activities Autofill PCS Activities If the Project Control (PCS) check box is selected in the Implemented Software Components (tccom0100s000) session, use the Autofill PCS Activities (tipcs4201m100) session to add reference operations to
activities. The task code is used as the reference-operation code. The
reference operation related to the machine type and the work center of the
activity is selected.
Step 3. ActivationClick Activate on the Job Shop by Site tab of the Multisite Concepts Activation (tcemm4600m000) workbench session. Note:
This button is only available for super users. The status changes from In Preparation to Active for each company of the current multicompany environment at the end of the
process. The first step of the activation process is the automatic
launch of the validation steps that you previously performed using the Validate Master Data for Job Shop by Site (timfc0200m000) session. References to routings and BOMs are converted to Job Shop
routings and Job Shop BOMs for these objects: - Planned orders of type Planned Production Order
- Production orders in the Production Orders (tisfc0501m000) session.
- Production order advice in the Production Order Advice (whina3100m000) session.
- Testing combinations in the Testing Combinations (qmptc0119m000) session.
- Requisitions in the Purchase Requisitions (tdpur2501m000) session.
- Requests for Quotation in the Requests for Quotation (tdpur1501m000) session.
- Costing breaks in the Costing Breaks - Production Resources (tppdm3102m000) session.
This master data is corrected: - Sub Work Centers (type will be Main Work Center)
- CPQ templates
- Testing Combinations
- Item Production
| |