|   | Check Horizons (cprpd1200m000)Use this session to update (full) cumulative
		  order lead times, and to compute the minimum length of order horizons and planning horizons in the Items - Planning (cprpd1100m000) session for a range of plan items. The calculations are based on: - Cumulative order lead
			 times
 - Synchronization
			 between order horizons at various BOM levels
 
 In the Items - Planning (cprpd1100m000) session, select the Automate Update Horizons check box for the items whose order horizon and planning horizon must be
		  updated. In the Update Method field,
			 you can choose these update methods: COLT Creates a report on the order horizons and planning horizons
			 that are too small, but does not actually update these horizons. COLT + Horizons When Too Small Updates the order horizons and planning horizons that are too
			 small COLT + All Horizons Updates all order horizons and planning horizons, resetting
			 them to their minimum levels 
 Regardless of the method you choose, in the Items - Planning (cprpd1100m000) session, these COLT values are always
			 updated: - COLT
 - Non-Critical COLT
 - Full Cumulative Order Lead Time
 - Full Non-Critical COLT
 
 Note The COLT calculation also takes into account the values
				that you specify in the following fields: -  Additional Lead Time
 -  Order Lead-Time Multiplier
 
   From Plan Item An item with the order system Planned. The production, distribution, or purchase of these items is
		  planned in Enterprise Planning based on the forecast or the actual demand. You can plan these items by means of the following: - Master-based planning, which is similar to master production
			 scheduling techniques.
 - Order-based planning, which is similar to
			 material-requirements planning techniques.
 - A combination of master-based planning and order-based
			 planning.
 
 Plan items can be one of the following: - An actual manufactured or purchased item.
 - A product family.
 - A basic model, that is, a defined product variant of a
			 generic item.
 
 A group of similar plan items or families is called a product
		  family. The items are aggregated to give a more general plan than the one
		  devised for individual items. A code displayed by the item code's cluster
		  segment shows that the plan item is a clustered item that is used for
		  distribution planning. Planner The employee or department responsible for planning the
		production, purchase and distribution of items. The planner takes into account
		the inventory levels, availability of materials, and capacities of resources,
		and reacts on signals such as rescheduling messages that LN generates. Order Lead-Time Multiplier The multiplier that is applied to the minimum order horizon and
		  minimum planning horizon to determine the actual order horizon and actual
		  planning horizon. Adjustment of the actual horizons depends on the selected Update Method. Include Parent Items If this check box is selected, the item selection is
		  extended with the parent items of the items in the selection range
		  (multi-level). Note The following restrictions apply: - The plan level of the items involved must fall within the
				selected range of plan levels.
 - LN simulates only
				parent items with an anonymous order policy. Items with an anonymous order
				policy have item codes with an empty project segment.
 
 Include Child Items If this check box is selected, the item selection is
		  extended with the components of the items in the selection range (multi-level). Note The following restrictions apply: - The plan level of the items involved must fall within the
				selected range of plan levels.
 - LN simulates only
				child items with an anonymous order policy. Items with an anonymous order
				policy have item codes with an empty project segment.
 
 Print Warnings If this check box is selected, besides the standard
		  error report, a warning report is generated. The warning report
			 contains warnings for parent items included in the selected range of plan items
			 for which LN was unable to check the horizons, because their phase number is lower than that
			 of the child item. Update Method Select one of the update methods from the pull-down menu. Regardless of the method you choose, in the Items - Planning (cprpd1100m000) session, these COLT values are always
				updated: - COLT
 - Non-Critical COLT
 - Full Cumulative Order Lead Time
 - Full Non-Critical COLT
 
 In the Items - Planning (cprpd1100m000) session, you must select the Automate Update Horizons check box for the items for which you want LN to update
			 the order horizon and the planning horizon. The difference between the three update methods is: COLT Creates a report on the order horizons and planning
				horizons that are too small, but does not actually update these horizons. COLT + Horizons When Too Small Updates the order horizons and planning horizons that are
				too small. COLT + All Horizons Updates all order horizons and planning horizons, resetting
				them to their minimum levels. 
    |   |