|   | Transfer Order Planning (cppat1210m000)Origin of the transferred orders You can transfer order from the actual scenario only. The types of planned supply that can be
			 transferred: Destination of the transferred orders - Planned production orders and production plans are translated
			 to production order in the Job Shop Control module in Manufacturing.
 - Planned purchase orders and purchase plans are translated to
			 purchase orders in Procurement.
 - Planned distribution orders for single-company distribution
			 are translated to warehouse orders in the Warehouse Orders module in
			 Warehousing.
 - Planned distribution orders for multicompany distribution are
			 translated to purchase orders in Procurement.
 - Cost Peg Transfers (as in session Project Cost Peg Transfers (whinh1140m000))
 
   Actual Scenario The scenario that contains the operational master plan or order
		plan, as opposed to scenarios used only for simulation, that is, what-if
		analysis. The actual scenario is the only scenario from which you can
		  transfer planned orders to the execution level. LN only transfers planned orders for the actual
			 scenario. Selection Transfer Planned Order Group If this check box is selected, Enterprise Planning transfers the production-order
				group that you specify in the Planned Order Group field, which is one of the Production data. If you select
				  this check box, the other options in the order selection group become
				  unavailable. Note You can create a
				  production-order group in the Create Order Group for Planned Orders (cppat3250m000) session. Purchase If this check box is selected, LN transfers the planned purchase orders for
				the selected plan items to the Purchase Control module. Cost Peg Transfers If this check box is selected, LN transfers the cost peg transfers for the selected items with the
				status Planned. Job Shop If this check box is selected, LN transfers the selected range of planned production orders (for the selected items) to the Job Shop Control module. Note If this check box is selected, LN does not transfer planned
				  production orders that belong to an order group. Purchase Plan If this check box is selected, LN converts the purchase plan of the specified plan item range to planned
				purchase orders, and transfers these purchase orders to Procurement. Note If the transfer process of the planned purchase orders
				  fails, LN does not
				  convert the planned purchase orders back into a purchase plan. The planned
				  purchase orders that LN was able to create remain to exist. Production Plan If this check box is selected, LN converts the production plan of the
				specified plan item range to planned production orders, and transfers these
				production orders to the Job Shop Control module of Manufacturing. The planned requirement date of the planned production orders
				  that LN creates is equal
				  to the start date of the plan period in which the production plan is
				  defined. Although the planned production orders that LN creates have the order
				  status Planned, you do not have
				  to check the Transfer Status Planned as Well check box to transfer planned
				  production orders derived from a production plan to execution
				  level. Note If the transfer process of the planned production orders
				  fails, LN does not
				  convert the planned production orders back into a production plan. The planned
				  production orders that LN was able to create remain to exist. Distribution If this check box is selected, LN transfers the planned distribution orders for the selected plan items to purchase orders in Procurement, or to warehousing order in the Warehouse Orders module in Warehousing. You can specify
				  a range of planned orders and a range of supplying companies. On the Purchase/Distribute tab, you can: - Define a range
					 of planned distribution orders.
 - Specify a range
					 of logistical companies that are involved in multicompany transactions in the Supply Chain Relationships From and To field.
 - Specify the
					 purchase order type and the production order series for multicompany
					 distribution orders that LN transfers to purchase orders.
 
 Selection Range From Plan Item Specify the first of a range of plan items for which LN must transfer the
				selected order type(s). Site The From and To fields define a range of: site. Item Group Specify the first of a range of item groups that you want to
				use as a criterion to select planned orders or production plans for transfer. Warehouse Specify the first of a range of warehouses that you want to use as a criterion to select
				orders for transfer. LN takes into account the
				  warehouse you specified in the Ordering Warehouse field in the Items - Planning (cprpd1100m000) session. Planner Specify the first of a range of planners that you want to
				use a criterion to select orders for transfer. Note If the Exclude Planner on Purchase Order check is
				  selected in the Planning Parameters (cprpd0100m000) session, the
				  planner will be cleared when a new purchase order is generated. Buyer Specify the range of buyers that you want to use
				a criterion to select orders for transfer. Selection Code Specify the first of a range of selection codes that LN must use as a
				criterion to select orders for transfer. Planned Start Date Specify the first of a range of fixed order start dates
				that LN must use as a
				criterion to select planned orders for transfer. Planned Finish Date Specify the first of a range of fixed order finish dates
				that LN must use as a
				criterion to select planned orders for transfer. Shop Floor Planner Specify the first of a range of shop floor planners that LN must use as a
				criterion to select orders for transfer. Production Job Shop Planned Production Orders Specify the first of a range of planned production orders that LN must transfer to
				the execution level. Note LN does not individually transfer
				  planned production orders that belong to an order group to the execution
				  level. You can only transfer the entire order group. Production Order Series The series from which the
				production order number will be taken. Allowed values Choose a series
				  from the number group that is
				  specified in the Number Group for Production Orders field in the Production Order Parameters (tisfc0100s000) session. Planned Order Group Planned Order Group Specify the first range of planned order groups that Enterprise Planning must
				  transfer to the Job Shop Control module in Manufacturing. Note You cannot
					 individually transfer a planned order that belongs to an order group, only the entire
					 group. Create Production Order Group If this check box is selected, LN creates an JSC order group and puts the
				  transferred orders into that JSC order group. If this check box is cleared, LN disbands the EP order group,
					 and transfers the planned orders of the order group individually. Production Order Series The series from which LN takes the production
				  order number. Allowed values Choose a
					 series from the number group that is
					 specified in the Number Group for Production Orders field in the Production Order Parameters (tisfc0100s000) session. Workload Control Transfer Until Workload This field determines whether LN must apply workload
					 constraints that limit the order transfer. Yes LN transfers a limited number of production orders, to ensure that the workload of the selected
						resources does not exceed certain limits. No The set of
						transferred orders is not limited by workload constraints or by a selection of
						resources. Only LN transfers a limited number of production orders, to ensure that the workload of
						the selected resources does not exceed certain limits. In addition, LN transfers only those
						production orders that utilize the capacity of the resources in the selection
						range. You can use this value when the workload of certain resources is too
						low. Resource If you selected Yes or Only in
					 the Transfer Until Workload field, you can specify a range of resources in the Resource From and To
					 field. LN only transfers planned production orders that use the specified
						resources. In addition, for each resource in the specified
						  range, LN takes into
						  account workload constraints, such as: - The planned
						  order data that you select in the Priority Rule field.
 - The
						  percentage that you specify in the Workload Norm Perc. field.
 
 Priority Rule If the workload is too high, LN cannot transfer all
					 production orders. This field
						determines which criterion LN uses to select production orders for
						transfer if the workload is too high.  Priority Rule Workload Norm Perc. Specify the percentage to modify the effective workload
					 norm for the specified range of resources. Example  Workload Norm: 50
						hours Workload Tolerance: 20% Workload Norm Percentage : 90% A workload
						of 20% in excess of 50 hours is 60 hours. LN will transfer production orders until a workload of 54 hours (90% of
						60). Purchase Planned Purchase Orders Specify the first of a range of planned purchase orders that LN must transfer to the
			 execution level. Purchase Order Type The purchase-order type for the
			 multicompany distribution orders. Specify the order type of the purchase orders to which LN transfers
				multicompany distribution orders. Note When the field is blank, LN gives an error message. Purchase Order Series The series from which LN takes the purchase
			 order number. Retain Buyer If this check box is selected, they buyer code is
			 active and will be retained through transfer to order management. Note Only visible when the Allow Buyer Assignment on Planned Purchase Order parameter is checked. Generate Request for Quotation This check box determines what happens if LN is unable to generate
			 an actual purchase order for a particular planned purchase order. If this check box is selected, LN transfers such a planned
				purchase order to a request for quotation (RFQ). If this check box is cleared, LN does not transfer the planned
				purchase order in question. This means that it remains a planned purchase
				order. RFQ Series View which series the request for quotation belongs
			 to. Distribution Supply Chain Relationships Specify the first of a range of logistical companies that are
			 involved in a multicompany supply structure. Transfer Multicompany Distribution Order Select the type of multicompany distribution
			 order. Allowed values - Purchase Order
 - Warehouse Transfer
 
 Purchase Order Type The purchase order type of the purchase orders to which the multicompany distribution
			 orders are transferred. When the field is
				empty, LN gives an error
				message. Purchase Order Series The purchase order series for the purchase orders to which LN transfers multi
			 company distribution orders. Warehouse Order Type Use this field to specify the Warehouse Order Type (as in
			 session Warehousing Order Types (whinh0110m000)) for the Warehousing order that will be
			 created. Note This field is only visible when this session is started
				via appropriate menu for
				one selected planned distribution order. This is because when
				multiple orders are selected, they can have different warehouses, which makes
				it unlikely that one warehouse order type is a good choice for all the selected
				planned orders. Different from/to warehouses lead to different defaults
				for different planned orders. Cost Peg Transfer Transfer View the number of the item to be transferred. Planning Group View the planning group from which the transfer takes
			 place. Requirement Date The date by which the transfer is needed. From Project Select the projects from which the cost pegs are
			 transferred. From Element Select the element from which the cost pegs are
			 transferred. From Activity Select the activity from which the cost pegs are
			 transferred. . Include Transfers based on Scheduled Receipts Based on defalut settings, EP will only transfer the planned
			 cost peg transfers to warehousing Cost Peg Transfer Series The number of the Cost Peg Transfer Series. Options Options Interactive If this check box is selected, LN does not immediately transfer the orders,
				but it first starts the Select Order Planning for Transfer (cppat0210m000) session. In the Select Order Planning for Transfer (cppat0210m000) session, you can make a final selection of
				  the planned orders that LN eventually transfers to the execution level. If this check box is cleared, LN directly transfers the selected
				  orders to the execution level. Include Items to be Customized If this check box is selected, you can also transfer
				planned orders, production plans and purchase plans for items for which the Customizable check box is selected in the Items (tcibd0501m000) session and the project segment is empty. You cannot select
				  this check box if the Interactive check box is cleared. Transfer Text As Well If this check box is selected, LN also transfers the text linked to each
				planned-order line of the transferred orders. You can link a
				  text to a planned-order line in the Planned Orders (cprrp1100m000) session. Transfer Status Planned as Well If this check box is selected, LN will also transfer the planned orders that
				have the order status Planned. Note Usually, LN only transfers planned
				  orders with order status Confirmed. Transfer Status Firm Planned as Well If this check box is selected, LN also transfers the planned orders that have
				the Firm Planned order status. Note Usually, LN only transfers planned
				  orders with the Confirmed order
				  status. Reports Process Report If this check box is selected, LN generates a process report. The process
				  report contains all the orders that are processed together with their order
				  number and the corresponding Job Shop Control order, purchase order, or warehouse order. Error Report If this check box is selected, LN generates an error report. The error report
				  contains all the orders that LN did not transfer, and states the reason why LN did not transfer
				  them. Use specific Devices If this check box is selected, a specific device must
				be selected for the generation of the report.    |   |