Component CTP and capacity CTP for planning clustersYou can use these types of available-to-promise functionality: Note If multisite functionality is active, the standard ATP check is performed per planning cluster. The ATP check takes supplying relations in to account when exploding the bill of material (BOM) for the component check. The ATP check find components through:
Example When a ATP check is done for Plan Item CPATP22, the result should be that 10 pieces can be delivered via the supplying relation CPATP22.1 <- ATP CPATP22.1. The item ATP CPATP22.1 has 10 pieces on hand. The ATP calculation always takes the minimum component CTP in the case of one supplying relation. Example The use of two companies and two supplying relations is possible. If there is an ATP request for ten pieces on ABE CPATP, the result of the ATP check should be that both five pieces on hand are found. Five pieces from ADL CPATP22.2.A and five from AFR CPATP22.2.A. In case of several supplying relations component CTP should be added to the previously found component CTP. If a plan item has a valid sourcing strategy, LN checks the component CTP and capacity CTP only if the sourcing strategy is Shop Floor, Subcontract, or Repetitive source (more than 0%). If a plan item has no valid sourcing strategy, LN checks the component CTP and capacity CTP only if the Actual Supply Source is Shop Floor, Subcontract, Repetitive, Distribution, or Purchase. Note The following capacity cannot be considered if the sourcing strategy is:
The capacity check can be done in case of components with the source Shop Floor. You can define a plan item's supply source in the Items - Planning (cprpd1100m000) and Items (tcibd0501m000) sessions. You can define a plan item's Supply Source, in the Items - Planning (cprpd1100m000) session.
| |||