Allow changes to shipment

If the Allow Changes to Shipment check box is selected in the Shipments (whinh4130m000) session, adding or removing shipment lines is allowed until the shipment status is set to Confirmed.

For shipments with status Projected, updates from the linked outbound-order lines are allowed. You can generate, regenerate, or delete projected shipments from an outbound-order line.

If this check box is cleared, these actions are not allowed:

  • Deleting the shipment, unless the status is Confirmed.

    Confirmed shipments can be deleted using the Remove Confirmed Shipments/Loads (whinh4250m000) session.

  • Adding or removing shipment lines.
  • Other updates of the shipment data.

    Note: for Projected shipments it is allowed to pick the shipment line quantities and change the status to Open when picking is confirmed.

Also, if you clear this check box, these options are unavailable:

Cancel originating order lines

An order line cannot be canceled if the Allow Changes to Shipment box is selected for the linked shipment. To cancel the order line, clear the Allow Changes to Shipment check box for the shipment.

Note

This check box is available if the EDI Status is set to Canceled.

This check box is cleared and unavailable in these cases:

  • The shipment status is either of these:

    • Frozen

      When a shipment is frozen, the Allow Changes to Shipment check box is cleared. If the user reopens the shipment, the Allow Changes to Shipment check box is automatically selected. This is done because a frozen shipment is reopened to implement changes to the shipment.

    • Confirmed, unless the Allow Changes to Confirmed Load/Shipments check box is selected in the Inventory Handling Parameters (whinh0100m000) session for confirmed shipments.

  • The shipment is submitted for acceptance or source accepted.
  • The Single Line per Shipment check box in the current session is selected.