| Copy Project Breakdown Structure (tscfg2210m200)Note To use this session, the following conditions must be met: Project The project from which the
physical breakdown will be created. Note - You can also use free projects. If you do so, be aware that
changes made to the project after you have copied the project, are not
processed to Service.
- For the entered project, the value of the Project PackageLinked field in the General Projects (tcmcs0552m000) session, must be Project.
Project The name or description of the project. Origin Structure Select the type of project-breakdown structure from which the
physical breakdown must be created. Project Element/Activity Element Structure and Activity Structures are the types of
project. If you select Activity Structure in the Origin Structure field, the code of the activity for the selected
project is displayed. If you select Element Structure in the Origin Structure field, the code of the top element for the selected project is displayed here. (Refer to the Element Budget Structure (tpptc1509m000) session). Description The description or name of the code. Installation Group The code of the installation group to which the newly-created physical breakdown belongs. Description The description or name of the code. Serialized Item Group The serialized-item group of the newly-created serialized
items. Note If the Serialized Item Group Usage parameter check box in
the Configuration Management Parameters (tscfg0100m000) session is selected, this field
must be filled. Delivery Time The delivery time of the newly created serialized item. If you
do not specify the value, LN considers the current time as the delivery time. Copy Materials If this check box is selected, the material lines
associated to the project are also copied. For the material lines to be copied,
Material Cost History line must be present. Generate Dummy Serial Numbers If this check box is selected, dummy serial numbers are
generated. | |