Print Cost Control (tpppc4411m000)

Use this session to print cost-control reports. Reports can be based on project, element, activity and extension by cost type, cost component, and control code.

The levels at which cost control is generated are selected in the Project - Cost Control Levels (tppdm6102m000) session. Various criteria, to make a selection of the projects and the information to be printed, are also available in this session.

Performance aspects

The settings in this session could affect system performance and database growth. For more information, refer to Print actual costs

 

Level to be Printed

The print level.

Report Type

The report type.

Period to

The report year.

/

The report period.

Currency

A generally accepted medium of exchange such as coins, treasury notes, and banknotes.

The following currency types are available in LN:

  • Home currency, which is used internally by companies to calculate costs, record budgets, and register tax amounts
  • Transaction currency, which is used in transactions with business partners, such as orders and invoices
Final Result Forecast

If this check box is selected, the final result forecast is printed.

Process Extension Lines

If this check box is selected, the extension lines are processed.

Commitments

If this check box is selected, the commitments are considered costs.

Aggregate Subprojects to Main Project

Aggregate the costs of the sub project to the main project.

Print Subprojects of Main Project

This print will give you an overview of the sub projects you use for the main project.

Sort By

The report's sort sequence.

WBS

If this check box is selected, the work breakdown structure is printed.

Control Accounts

If this check box is selected, the control accounts are used in the print.

Planning Packages

If this check box is selected, the planning package s are used in the print.

Work Packages

If this check box is selected, the work package s are used in the print.

Material

If this check box is selected, this cost control cost type is printed.

Labor

If this check box is selected, this cost control cost type is printed.

Equipment

If this check box is selected, this cost control cost type is printed.

Subcontracting

If this check box is selected, this cost control cost type is printed.

Sundry Cost

If this check box is selected, this cost control cost type is printed.