The fiscal period for which the overheads are calculated. The value in this field is retrieved based on the value selected in Fiscal Period Selection field.
Calculate Overhead (tppdm2200m000)Use this session to calculate overhead costs that must be applied for projects. Note
Project Selection Calculate Overhead up to and including Calculate up to and including fiscal period The fiscal period for which the overheads are calculated. The value in this field is retrieved based on the value selected in Fiscal Period Selection field. Year The fiscal year of the period for which the overheads are calculated. This is a display field. Period End Date The date of the fiscal period up to and including which the overheads are calculated. This is a display field. Fiscal Period Selection Fiscal Period Selection The fiscal period for which the overheads are calculated. Allowed values
Note The option selected will determine the values displayed in the Calculate up to and including fiscal period and Period End Date field. Projects Exclude If this check box is selected, the enterprise unit, program, project-group or project, within the specified range are excluded from the overhead calculation and application. Project Level The aggregation-level to select the projects for which the overheads are calculated. Allowed values Project The From and To fields define a range of: Enterprise units, Programs, Project-groups or Projects specified in the Project Level field. Exclude If this check box is selected, the enterprise unit, program, project-group or project, within the specified range are excluded from the overhead calculation and application. Project Level The aggregation-level to select the projects for which the overheads are calculated. Allowed values Project The From and To fields define a range of: Enterprise units, Programs, Project-groups or Projects specified in the Project Level field. Exclude If this check box is selected, the enterprise unit, program, project-group or project, within the specified range are excluded from the overhead calculation and application. Project Level The aggregation-level to select the projects for which the overheads are calculated. Allowed values Project The From and To fields define a range of: Enterprise units, Programs, Project-groups or Projects specified in the Project Level field. Exclude If this check box is selected, the enterprise unit, program, project-group or project, within the specified range are excluded from the overhead calculation and application. Project Level The aggregation-level to select the projects for which the overheads are calculated. Allowed values Project The From and To fields define a range of: Enterprise units, Programs, Project-groups or Projects specified in the Project Level field. Exclude If this check box is selected, the enterprise unit, program, project-group or project, within the specified range are excluded from the overhead calculation and application. Project Level The aggregation-level to select the projects for which the overheads are calculated. Allowed values Project The From and To fields define a range of: Enterprise units, Programs, Project-groups or Projects specified in the Project Level field. Exclude If this check box is selected, the enterprise unit, program, project-group or project, within the specified range are excluded from the overhead calculation and application. Project Level The aggregation-level to select the projects for which the overheads are calculated. Allowed values Project The From and To fields define a range of: Enterprise units, Programs, Project-groups or Projects specified in the Project Level field. Exclude If this check box is selected, the enterprise unit, program, project-group or project, within the specified range are excluded from the overhead calculation and application. Project Level The aggregation-level to select the projects for which the overheads are calculated. Allowed values Project The From and To fields define a range of: Enterprise units, Programs, Project-groups or Projects specified in the Project Level field. Exclude If this check box is selected, the enterprise unit, program, project-group or project, within the specified range are excluded from the overhead calculation and application. Project Level The aggregation-level to select the projects for which the overheads are calculated. Allowed values Project The From and To fields define a range of: Enterprise units, Programs, Project-groups or Projects specified in the Project Level field. Exclude If this check box is selected, the enterprise unit, program, project-group or project, within the specified range are excluded from the overhead calculation and application. Project Level The aggregation-level to select the projects for which the overheads are calculated. Allowed values Project The From and To fields define a range of: Enterprise units, Programs, Project-groups or Projects specified in the Project Level field. Exclude If this check box is selected, the enterprise unit, program, project-group or project, within the specified range are excluded from the overhead calculation and application. Project Level The aggregation-level to select the projects for which the overheads are calculated. Allowed values Project The From and To fields define a range of: Enterprise units, Programs, Project-groups or Projects specified in the Project Level field. Exclude If this check box is selected, the enterprise unit, program, project-group or project, within the specified range are excluded from the overhead calculation and application. Project Level The aggregation-level to select the projects for which the overheads are calculated. Allowed values Project The From and To fields define a range of: Enterprise units, Programs, Project-groups or Projects specified in the Project Level field. Exclude If this check box is selected, the enterprise unit, program, project-group or project, within the specified range are excluded from the overhead calculation and application. Project Level The aggregation-level to select the projects for which the overheads are calculated. Allowed values Project The From and To fields define a range of: Enterprise units, Programs, Project-groups or Projects specified in the Project Level field. Options Number of parallel processes This specifies the number of the overhead calculation processes or workers running parallel at the same time. This is a display field. Note This value can be set or configured using the Servers field in the Parallel Processing Configuration (ttaad7520m000) session. Logging If this check box is selected, the overhead calculation process information are saved in log file after calculation. File The path in which the overhead calculation log file is saved after calculation.
Calculate Calculates the overheads that must be applied to the selected projects.
| |||