Search criteria for costing breaks
Infor LN uses a search criteria for costing breaks defined for the
production resources and production materials either for a specific project or
a blank project.
The search criteria that Infor LN follows;
for costing breaks:
- Costing breaks defined for the production resources for the
specific project.
- Costing breaks set up for the production resources for a blank
project.
- Costing breaks set up for the production material for the
specific project.
- Costing breaks set up for the production material for a blank
project.
The hierarchical search sequence applicable for production
(material and resources):
Production type | I | II | III | IV | V |
Production -Material | Main item / BOM Component
item | Item group / Main item | only the
Main item | only the BOM Component item | Item group |
| | | | | |
Production
-Resources | Main item / Routing / Operations | Main item / Routing | Work center | Cost type / Main item | |
Note
- For production material; you can use the Import Item Groups and the Import Components options to set up costing break for
multiple item groups and component items of the main item.
- For production resources; you can use the Import Operations and the Import Work Centers options to set up costing break for
multiple routing operations and work centers.
The hierarchical search sequence applicable for service depot
repair:
Service type | I | II | III | IV | V |
Service Depot Repair Material | Service item
group | Installation group | Service item
(Main Item) | Serialized item (Item) | Item serial number |
Service Depot
Repair Labor | Master routing | Routing
option | Reference activity | Task |
Service Depot Repair
Other | Item group | Item | Cost Type level for Tooling, Subcontracting and Other
costs. |
Note
- For service depot repair material; you can use the Import Service Item Groups and the Import Installation Groups options to set up costing
break for multiple service item groups and installation groups.
- For service depot repair labor; you can use the Import Master Routings option to set up costing break
for multiple master routings.
- For service depot repair other; you can use the Import Item Groups option to set up costing break for
multiple item groups.